| dc.contributor.author | Sally, Hilmy | en_US |
| dc.contributor.author | Berthery, D. | en_US |
| dc.contributor.author | Certain, F. | en_US |
| dc.contributor.author | Durbec, A. | en_US |
| dc.date.accessioned | 2014-06-13T13:51:19Z | en_US |
| dc.date.available | 2014-06-13T13:51:19Z | en_US |
| dc.identifier.uri | https://hdl.handle.net/10568/39166 | en_US |
| dc.title | Calibration of the Kirindi Oya RBMC mathematical flow simulation model: description of the field measurement campaign and preliminary results | en_US |
| dcterms.abstract | The purpose of this paper is to document the field measurement campaign carried out in the Kirirrli Oya RBMC with a view to calibrating the mathematical model. The preliminary analysis leading to estimates of some of the hydraulic parameters needed by the model is also described. | en_US |
| dcterms.accessRights | Open Access | en_US |
| dcterms.bibliographicCitation | Sally, H.; Berthery, D.; Certain, F.; Durbec, A. 1989. Calibration of the Kirindi Oya RBMC mathematical flow simulation model: description of the field measurement campaign and preliminary results. Digana Village, Sri Lanka: International Irrigation Management Institute (IIMI). 26p. (IIMI Working Paper 010) | en_US |
| dcterms.isPartOf | IIMI Working Paper 010 | en_US |
| dcterms.issued | 1989 | en_US |
| dcterms.language | en | en_US |
| dcterms.publisher | International Irrigation Management Institute | en_US |
| dcterms.subject | calibrations | en_US |
| dcterms.subject | mathematical models | en_US |
| dcterms.subject | simulation models | en_US |
| dcterms.subject | privatization | en_US |
| dcterms.subject | measurement | en_US |
| dcterms.subject | research | en_US |
| dcterms.type | Working Paper | en_US |
| cg.identifier.url | https://publications.iwmi.org/pdf/H05406.pdf | en_US |
| cg.coverage.region | South-eastern Asia | en_US |
| cg.coverage.region | Southern Asia | en_US |
| cg.coverage.country | Sri Lanka | en_US |
| cg.coverage.iso3166-alpha2 | LK | en_US |