Working Paper 72 Volume 1 The Transformation of Irrigation Boards into Water User Associations in South Africa: Case Studies of the Lower Olifants, Great Letaba and Vaalharts Water User Associations Jetrick Seshoka, Willem de Lange and Nicolas Faysse International Water Management Institute The authors: Jetrick Seshoka is a Research Assistant at the International Water Management Institute’s Africa Office. Willem de Lange was a Research Assistant at the International Water Management Institute’s Africa Office. Nicolas Faysse has held the position of a IWMI- Cemagref Water Resource Post-Doctoral Economist. He currently works as researcher for the CIRAD French Research Institute at Centro AGUA, Universidad Mayor de San Simon, Cochabamba, Bolivia.(nicolas.faysse@m4x.org). Seshoka, J.; de Lange, W.; Faysse, N. 2004. The transformation of irrigation boards into water user associations in South Africa: Case Studies of the Lower Olifants, Great Letaba and Vaalharts Water User Associations. Working Paper 72. Colombo, Sri Lanka: International Water Management Institute. / water users’ associations / case studies / irrigation water / farmers / river basins / water resource management / water quality / land ownership / financing / canals / dams / crops / water allocation / irrigation programs / South Africa / ISBN 92 9090 558 1 Copyright 2004, by IWMI. All rights reserved. Please direct inquiries and comments to: iwmi@cgiar.org IWMI receives its principal funding from 58 governments, private foundations and international and regional organizations known as the Consultative Group on International Agricultural Research (CGIAR). Support is also given by the Governments of Ghana, Pakistan, South Africa, Sri Lanka and Thailand. iii Contents Acknowledgments.......................................................................................................... v Acronyms ....................................................................................................................... vi Summary ........................................................................................................................ vii Introduction.................................................................................................................... 1 The Lower Olifants Water User Association ................................................................. 3 The Letaba Water User Association............................................................................... 29 The Vaalharts Water User Association .......................................................................... 48 Appendices..................................................................................................................... 59 Appendix I............................................................................................................. 61 Appendix II............................................................................................................ 63 Literature Cited .............................................................................................................. 64 iv Tables Table 1. Stakeholders interviewed in the Lower Olifants WUA......................... 4 Table 2. EKB theoretical entitlement to irrigation water .................................... 15 Table 3. Weekly flow for the LORWUA EKB meter ......................................... 17 Table 4. Water need at EKB measuring point in the peak season....................... 20 Table 5. Financing of the EKB balance dam....................................................... 24 Table 6. Stakeholders interviewed in the Great Letaba WUA ............................ 30 Table 7. Water allocation in the different zones of the Great Letaba River basin ........................................................................ 39 Table 8. Water fees in the LWUA in 2003.......................................................... 42 Table 9. Assessment of the emerging farmer’s problems ................................... 43 Table 10. Assessment of water needs in order of importance............................... 43 Table 11. Stakeholders interviewed in the Vaalharts WUA.................................. 48 Table 12. Irrigation techniques used in the Taung Scheme................................... 51 Table 13. Composition of the main MC and the subarea MCs ............................. 55 Figures Figure 1. IBs or WUAs with a large presence of HDIs ........................................ 2 Figure 2. The Lower Olifants River Water User Association .............................. 5 Figure 3. Registered water users in the LORWUA .............................................. 7 Figure 4. General needs of the EKB and the VSB ............................................... 12 Figure 5. Water-related needs of the EKB and the VSB ...................................... 13 Figure 6. Total flow arriving at the entry of the EKB .......................................... 17 Figure 7. Average weekly flow with Standard Deviation at the EKB meter........ 18 Figure 8. Cropping pattern in the EKB................................................................. 18 Figure 9. EKB monthly crop water requirements................................................. 19 Figure 10. EKB weekly irrigation requirements..................................................... 19 Figure 11. Schematic description of the canal network within the EKB................ 21 Figure 12. The Great Letaba River Basin............................................................... 31 Figure 13. Annual water allocation from the Ebenezer and Tzaneen Dams .......... 33 Figure 14. The area of the Vaalharts Water User Association ............................... 49 v Acknowledgments Many people were associated in giving us information and are gratefully acknowledged here. We thank more specifically the staff of the Department of Water Affairs and Forestry (DWAF) provincial offices: W. Tuna (Polokwane), T Ravenhill (Tzaneen), H.Dutoit (Kimberley) and W. Enright (Cape Town). The chairmen of the Water User Associations (WUAs): J. Matthee (Lower Olifants), L. Van Royen (Great Letaba) and M.Mombert (Vaalharts) welcomed the study and provided support all along its course. The secretary of the Great Letaba WUA, J.J. Venter, assisted the study with enthusiasm and patience. We express our particular thanks to A. Mongwe, S.N. Qomondi and N.N. Mashele in Great Letaba WUA, M. Tonyane in Vaalharts WUA and C. Williams and P. Hahn in the Lower Olifants WUA. Finally we wish to thank Barbara van Koppen and Douglas Merrey for their comments on the paper, and both International Water Management Institute (IWMI) and Cemagref, (a French Institute for Environmental Science and Expertise for the Sustainable Management of Land and Water) for supporting this research. Nicolas Faysse is grateful to both IWMI and Cemagref for co-supporting his Post-Doctoral Fellowship. vi Acronyms ARDC Agricultural Rural Development Cooperative BP Business Plan CF Commercial Farmer CLP Compulsory Licensing Process CMA Catchment Management Agency DoA Department of Agriculture DEAT Department of Environment Affairs and Tourism DoLA Department of Land Affairs DWAF Department of Water Affairs and Forestry HO Head Office RO Regional Office EF Emerging Farmer EKB Ebenhaezer Small-scale Farmers HDI Historically Disadvantaged Individual IB Irrigation Board IWRM Integrated Water Resource Management LNW Lepelle Northern Water LORWUA Lower Olifants Water User Association LRC Legal Resource Centre LWUA Letaba Water User Association MAR Mean Annual Runoff MC Management Committee MM Matsikama Municipality NWA National Water Act NWRS National Water Resource Strategy PTO Permission To Occupy RDP Reconstruction and Development Program RSA Republic of South Africa (under the previous dispensation) SAB South African Breweries SPP Surplus People Project TRANCRAA Transformation of Certain Rural Areas Act VHWUA Vaalharts Water User Association VGK Verenigende Gereformeerde Kerk VSB Vredendal Saamwerk Boerdery (Vredendal small-scale farmers) WUA Water User Association WDM West Coast District Municipality ZAR South African Rand vii Summary In South Africa, the 1998 National Water Act launched an in-depth reform of water resource management. At the local level, all the Irrigation Boards (IBs), which used to be managed by large-scale farmers, are to be transformed into Water User Associations (WUA). These WUAs should incorporate all users--whether they have a formal water entitlement or not--in the defined area of jurisdiction. This transformation will enable better participation by the historically disadvantaged individuals (HDIs) in the management of the water resources. It will also provide a basis for improved and integrated local management of water resources. The International Water Management Institute (IWMI), in cooperation with the Department of Water Affairs and Forestry (DWAF), has undertaken a research program on the transformation of IBs into WUAs. The main objective of the research was to understand the constraints and opportunities of the transformation, with regard to the goal of meeting HDIs’ water-related needs. A secondary objective was to assess the role of these new WUAs with regard to integrated local water resource management. This working paper covers three case studies of IBs that have already been transformed into WUAs. The case studies constitute the background information for the research report entitled An assessment of small-scale users’ inclusion in large-scale WUAs in South Africa. The first case study is the Lower Olifants WUA in the Western Cape, which was the first WUA in South Africa. Its principal functions are to operate and maintain a canal that enables irrigation throughout the year in an arid region. Around 9,200 hectares are irrigated, mainly for vineyards. The Ebenhaezer Colored community is situated downstream in the system. This community is supposed to receive a given amount of water free, in compensation for its forced displacement in 1913. The community does not receive the water on demand as the upstream commercial farmers do: Instead, it basically receives the unused flow at the end of the system. The community does generally receive its water entitlement, but it cannot schedule this flow nor store the unused water. The involvement of the community within the WUA should have been an opportunity for capacity building, but has failed to solve the abovementioned problem. The second case study relates to the Great Letaba WUA in the Limpopo Province. This WUA manages the allocation of water downstream of two large dams, near the town of Tzaneen. An area of 12,500 hectares is irrigated in the river valley, mainly for fruit tree farming. There are four small-scale farmer schemes under the jurisdiction of the WUA. They face many internal problems, especially with regard to land tenure. The emerging farmers are involved in the WUA, which helps them in terms of capacity building and linking with other institutions. The WUA also undertakes some actions to support them. However, in periods of water restrictions, the emerging farmers face the same water restrictions as the commercial farmers, although the Department of Land Affairs (DoLA), which is paying their water fees, is paying for more water than they use. The third case study assesses the Vaalharts WUA, which is situated in both Northern Cape and North West provinces. This WUA is one of the largest irrigation schemes in South Africa (37,100 hectares overall). It manages mainly a canal that takes water from the Vaal River to irrigate commercial farms and, downstream, the Taung Irrigation Scheme in the former Bophuthatswana homeland. Emerging farmers in Taung use mainly pivot irrigation and have faced many financial and technical problems. More recently, a brewery company has started contracting with them for the production of barley and helps them in their farming activities. 1 Introduction In South Africa, the 1998 National Water Act (Act 36 of 1998) launched an in-depth reform of water resource management. At the local level, all the Irrigation Boards (IBs) are to be transformed into Water User Associations (WUA). These WUAs are to invite all users-- whether they have a formal water entitlement or not--to be incorporated in the defined area of jurisdiction. The transformation from IBs to WUAs was to enable better participation of ‘historically disadvantaged individuals’ (HDIs) in the management of their water resources. This term refers to all the persons who were deprived of certain rights during the apartheid regime, i.e., black, colored, Asian and disabled people, as well as women.1 The transformation from IBs to WUAs is also designed to provide a basis for undertaking some initiatives for integrated local management of the water resources. The International Water Management Institute (IWMI), in cooperation with the Department of Water Affairs and Forestry (DWAF) has undertaken a research program on this transformation. The main objective of the research is to understand the constraints and opportunities inherent in the transformation, with regard to the goal of meeting the water- related needs of HDIs. A secondary aim of the research is to understand the potential for WUA involvement in the integrated management of water resources. The main output of this research is the IWMI Research Report: An assessment of small-scale users’ inclusion in large-scale water user associations in South Africa(Faysse, forthcoming 2004). Seven case studies provide the backbone of the research report. A team of researchers performed these studies between July 2002 and July 2003. This working paper presents three examples of IBs that have already been transformed into WUAs: the Lower Olifants and Great Letaba Water User Associations come from former Irrigation Boards, while the Vaalharts WUA comes from the integration of two government water schemes and one emerging farmer scheme. (Three other case studies of Irrigation Boards that are still to be transformed into WUAs are presented in another Working Paper.) The description of the research and the introduction to the South African context are given in the research report, hence not repeated here. Willem de Lange wrote the section on the Lower Olifants WUA in the Western Cape. Jetrick Seshoka was responsible for the case study of the Great Letaba WUA in the Limpopo Province. Nicolas Faysse wrote the last section, on the Vaalharts WUA. Figure 1 shows the location of these case studies, as well as the other IBs or WUAs that have a significant population of HDIs (see Faysse 2004). Each case study report has been reviewed by at least the chairman of the WUA or the IB. The study has been co-funded by IWMI and the Cemagref 1A formal definition is: ‘HDI’ means a South African citizen, who (i) due to the apartheid policy that had been in place, had no franchise in national elections prior to the introduction of the Constitution of the Republic of South Africa, 1983 (Act 110 of 1983) or the Constitution of the Republic of South Africa, 1993 (Act No. 200 of 1993) (the interim Constitution); and/or (ii) is a female; and/or (iii) has a disability, provided that a person who obtained South African citizenship on or after the coming to effect of the Interim Constitution, is not to be an HDI” (Preferential procurement regulations, as approved in April 2001 pertaining to the Preferential Policy Framework Act No. 5 of 2000). 2 Figure 1. IBs or WUAs with a large presence of HDIs. 3 The Lower Olifants Water User Association The first two sections of this case study describe the methodology and the study area. The next section focuses on the current situation with regard to water management in general in the Lower Olifants River Water User Association (LORWUA) area. The following section describes and analyses the most important problems faced by HDIs in the LORWUA and some suggestions are given for addressing these problems. The last section discusses some issues directly related to the accommodation of HDIs in the LORWUA. Methodology The analysis is based on a grid of initial questions. The following questions were used as an initial guide for the study. Research Questions What has changed for the HDIs with the transformation from the Vredendal Irrigation Board into the LORWUA? This is the main research question of the case study because it has been 5 years since the 1998 National Water Act (NWA) was enacted, arousing high expectations with regard to the accommodation and promotion of HDIs in water management, since that was one of the corner stones of the Act (NWA, section 2). This research question is broken down into several other questions: • What is the overlap between LORWUA functions and HDI needs? This question tries to determine the extent to which the needs of HDIs in the LORWUA are satisfied and, thereby also tests the impact of the WUAs created under the 1998 NWA with regard to the accommodation and promotion of these groups. In order to do this, the most important needs of the HDIs were identified and ranked. • How much do HDIs participate in LORWUA? This question looks at the degree of decentralization of the water management achieved, since this was also one of the important aims of the Act. Decentralization implies the involvement of all water users in one WUA, including HDIs. • What has changed in the transformation from the Vredendal Irrigation Board into the LORWUA? This question investigates the transformation process of LORWUA. Since LORWUA is currently still in the process of transformation, this question also addresses the changes occurred after the constitution was enacted (e.g., changes in responsibilities and in staff). • To what extent does LORWUA practice integrated water resource management? Integrated water resource management (IWRM) may be described as an “evolving, iterative process for the coordinated planning and management of water, land and the environment resources for their equitable and sustainable use” (DWAF 2002-- First definition of a National Water Resource Strategy {NWRS]). It involves coordination of the quantity, quality, environmental, and health aspects of water, achieved at the level of the water resource unit, i.e., a catchment or an aquifer. Although this definition of IWRM is not always clear-cut, this question addresses the extent to which LORWUA takes responsibility for the IWRM of the basin. 4 Persons Interviewed The study was mainly based on semi-structured interviews with the different stakeholders: commercial and emerging farmers,2 environment representatives, municipalities, Non- Governmental Organizations (NGOs), Department of Agriculture (DoA) and Department of Water Affairs and Forestry (DWAF), etc. A total of 23 people have been interviewed (table 1). The reference codes given in this table will hereafter be placed in brackets and used at the end of a relevant sentence to signify that a specific stakeholder is the source of information. Table 1. Stakeholders interviewed in the Lower Olifants WUA. Stakeholder Reference Number Matsikama Municipality Western Cape Department of Agriculture Department of Water Affairs and Forestry HDIs Ebenhaezer small-scale farmers Vredendal Saamwerk Boerdery (Vredendal Small-scale farmers) Farm workers West Coast District Municipality Cape Nature Conservation Surplus People Project LORWUA Commercial Farmers HDI Advice Committee Legal Resource Centre Namakwaland Agricultural Co-operation MM1; MM2; MM3 WCDoA1; WCDoA2 DWAF1; DWAF2 EKB1; EKB2; EKB3 VSB1 FW1 WDM1 CNC1 SPP1 L1; L2; L3 CF1; CF2 HAC1 LRC1 NLK11 3 2 2 3 1 1 1 1 1 3 2 1 1 1 Total 23 Context Description of the Basin The Olifants/Doring Rivers water management area is situated along the west coast of South Africa, beside the cold Benguela sea current of the Atlantic Ocean. The catchment is characterized by a Mediterranean climate with a strong deterministic water supply (winter rainfall) from mid-May to the end of August. The summer months, November to February, are very warm and dry, and are characterized by extremely high evaporation losses. Climate variation is extreme, with summer temperatures reaching 45 °C in the Vredendal/Koekenaap area, and snowfall until mid-September in the Cederberg wilderness area. Precipitation varies from over 1,000 millimeters per year in the Cederberg mountains to less than 100 millimeters per year in the northern coastal areas (DWAF 2002). 2‘Commercial farmer’ means a large-scale, almost always white farmer, while ‘emerging farmer’ means a small- scale, historically-disadvantaged farmer. 5 All the surface flows originate from the Cederberg mountains and are carried to the Atlantic by the Olifants and Doring Rivers (only the Olifants is a perennial river). The DWAF (2002) provides some information regarding the balance between resources and uses in the catchment, in which LORWUA is situated. It shows a current deficit, which should worsen in the future, especially with the definition of an Ecological Reserve (a minimum flow set aside for environmental purposes). The area studied is in the lower part of the Lower-Olifants/Doring Rivers catchment and is situated near the towns of Klawer, Vredendal, Lutzville, and Koekenaap in the Western Cape (figure 2). The main storage dam in the catchment area is the Clanwilliam Dam situated on the Olifants River (with a capacity of 127,000,000 cubic meters) upstream of the town of Clanwilliam. There is no large storage dam on the Doring River. The Clanwilliam Dam feeds the Bulshoek Dam, which has a capacity of 5,000,000 cubic meters and is mainly used as a balance dam for the LORWUA Irrigation Scheme (L1). The irrigation scheme is serviced by an open concrete canal system. The main canals stretch over 280 kilometers (60 km for secondary canals). The system operates on a just-in-time basis, using a water demand scheduling system managed by LORWUA (MM3). Figure 2. The Lower Olifants River Water User Association. History In the 1800s, irrigation practices in the Olifants/Doring area were based on the winter river floods. Predictably, these were not very reliable and, together with the erosion-related problems, it became necessary to seek alternative methods of irrigation (Wellmann 2001). “In 1911 the Olifants River Irrigation District was proclaimed and the irrigation scheme was first authorized under Act 5 of 1912 (Ebenhaezer was included in this proclamation). This district was governed by the Olifants River Irrigation Board. A 6 loan of £155 000 was provided to assist in the construction of canals and the building of the Bulshoek Dam in 1913….Considerable irrigation possibilities were discovered lower down in the Olifants/Doring River area that was outside the proclaimed irrigation district. Therefore, the scheme was entirely recast and extended. Act 28 of 1917 now governed the scheme and costs were estimated at £505 000 from which £252 500 was a loan to the Olifants River Irrigation Board and was to be repaid by the rate of £112.60/morgen/yr. The project was completed in 1924 at a cost of £600 000 and consisted 170 kilometers of ground canals. However, this system was poorly managed and, due to canal breaks, leaks, cave-ins and insufficient storage capacity of Bulshoek Dam, the water supply became unreliable. It was decided to build the bigger Clanwilliam Dam and this project was completed in 1935” (Wellmann 2001). This Clanwilliam Dam ensured ample storage capacity but the IB did not consolidate the existing scheme, resulting in a continued irregular water supply and some friction among the water users of the system. The situation continued for another 8 years before the state took over the management of the whole scheme in the mid-1940s. Under state management, most of the canal was lined with concrete by the early 1960s. This smoothing out of the water supply led to prosperity in the valley and proper administration of the scheme. Measuring weirs were erected to regulate the flow and ensure a more constant supply of water (Wellmann 2001). After the late 1960s, the Vredendal Irrigation Board assisted the state in managing the irrigation scheme. The Vredendal IB was never in control of the management of the scheme and was only involved as an advisory body (L1). The IB consisted mainly of commercial farmers (CFs) and formed the basis of the LORWUA. An advisory committee from the DWAF was appointed to facilitate the transformation process towards a WUA and, although this was a slow process, in 2000, the first WUA in South Africa, namely, the Lower Olifants River Water User Association was successfully set up. The LORWUA constitution was approved on 6 January 2000 by the Minister of the Department of Water Affairs and Forestry. Water Uses in the Basin It is important to note that the LORWUA area is not the whole of the Olifants River basin. The upper reaches and the area between the Clanwilliam and Bulshoek dams are excluded from the LORWUA, together with all the tributaries (Doring River, etc.,). Figure 3 gives a schematic representation of the water use of all registered water users in the canal managed by LORWUA. Commercial agriculture is still by far the dominant water use practice in LORWUA. The belowmentioned uses are canal users only. The LORWUA area also includes roughly ten water users with pumping rights for extraction directly from the river (L1). The biggest of these users is the Lutlouw equity-sharing project opposite the Ebenhaezer community (refer to figure 2) with a dam that has a storage capacity of 2,000,000 cubic meters, and is filled in winter with flood water from the river. 7 Figure 3. Registered water users in the LORWUA. Commercial Farmers Economic activity is concentrated on commercial, irrigated agriculture with approximately 90 percent of the total water used for irrigated agriculture. Crops farmed are: wine grapes, table grapes, tomatoes, citrus, deciduous fruit and vegetables. Drinking Water Use and Industries The Matsikama Municipality (MM) is also a user of the canal, with formal registered water rights (figure 3). There are also some industries, involved in sand extraction or production of concentrated tomato juice. HDIs The three main groups of HDIs in the LORWUA area were identified as the Vredendal small-scale farmers (VSB), the farm workers employed by the commercial farmers, and the Ebenhaezer community (consists the Ebenhaezer small-scale farmers [EKB] and the Ebenhaezer domestic users). The second group of HDIs water users are small-scale farmers (seven farmers) cultivating in the neighborhood of the Vredendal town. They get their water from the Municipality. The third group of HDIs is the farm workers on commercial farms. These people mainly work for CFs and do not irrigate their own crops. It is important to give some history and background information relative to the Ebenhaezer community. The Ebenhaezer community comprises roughly 3,000 inhabitants (i.e., around 500 families). It is situated in the Van Rhynsdorp magisterial district along the Olifants River approximately 20 kilometers west of Lutzville (refer to figure 2). The Rhenish Mission built a school and a church on the site, which was already serving as a trading post for northbound travelers in 1832. In July 1837, the British Crown granted 5,270 Industrial 140 ha Emerging farmers 335 ha Domestic 557 ha Commercial farmers 8, 176 ha 8 morgen3 of land to the Rhenish Missionary Society Trust but this land was abandoned in 1887 and, in 1890, it was transferred to the Dutch Reformed Church (Surplus People Project 1995: 80-93 and SPP1) The 1925 Exchange of Land Act (Act 14 of 1925) enabled the government to dispossess the Ebenhaezer community of portions of the Ebenhaezer and Doornkraal farms in favor of white settlement, in order to assist poor white families after the First World War. The Act made provision that other land, adjoining the retained part of Ebenhaezer, be granted to the Ebenhaezer community (Union of South Africa. Act 14 of 1925). The land was consolidated into the Farm Ebenhaezer Kolonie, where the Ebenhaezer community still lives today. However, no land ownership was granted to these people. A further provision of the Act was that, in terms of the Mission Stations and Communal Reserves Act (Union of South Africa. Act 29 of 1909), all registered occupiers of land were entitled to water free of charge from the Olifants River Irrigation Scheme in respect of an area of 300 morgen (257 hectares). However, the EKB was to provide free labor for the maintenance of their canal.4 These water use rights were originally meant only for irrigation purposes: domestic use was very small and undefined at that stage. These water use rights were divided among 150 small-scale farmers, but administered as a single farmer by the water authority. Today, the water for the registered 257 hectares is used for domestic purposes as well as irrigation. (Note that under the article 56[3] of the Water Act [Union of South Africa. Act 54 of 1956], Ebenhaezer was not authorized to receive domestic water.) As the population of Ebenhaezer grew and domestic water use increased, the competition for water resources became more evident. This increased demand for water set the scene for future conflict situations between water users in the Ebenhaezer area, in a context of a decreasing flow available to the Ebenhaezer community. Most of the EKB farmers are very poor, live in marginal conditions and are dependent on subsistence irrigation, fishing, and sheep farming. The Ebenhaezer community is also currently engaged in a land claim, with which they are being assisted by the Legal Resource Centre (LRC) in Cape Town (LRC1). The Surplus People Project NGO has worked closely with this community by facilitating the processes of the restitution claim through capacity building, technical assistance, and negotiation support. Water-related issues are part of the problem and, throughout the study issues related to land and water will be mentioned simultaneously. Water Management Issues Water Quantity Currently, water supply just balances water demand. All irrigators in the LORWUA are completely dependent on the canal system for their irrigation and domestic needs, with the exception of the few water users who have rights to pump directly from the river in winter. All water use rights within the system have already been issued and no additional rights are available (L1). The use of a demand-orientated approach in managing the canal is problematic because of the long time (approximately 3 days) it takes for releases from the Bulshoek Dam to reach the EKB, who are the end users of the canal. During this period, transportation losses can be extremely high, particularly in summer, from November to February. It is, therefore, difficult to supply the demanded volumes of the water users towards the end of the canal.. In the Olifants River itself, no releases are made from Bulshoek for the ecological reserve, because the dam is leaking at 1,000 m3/hour (MM3). 3A South African unit of area, equal to about 2 acres or 0.8 hectare; from the Dutch: morning, a morning’s ploughing. 4This canal refers to the internal distribution system of EKB, downstream from the LORWUA EKB water meter. 9 Insufficient quantity (or canal flow) is the main water-related problem HDIs face in the canal and, therefore, will be the main focus of this paper. Water Quality in the Canal The water quality at the entrance to the canal is good. Upstream, the Bulshoek Dam acts as a purification system and agricultural effluents cannot percolate into the canal since it is lined with concrete and most of the irrigation is done downstream in the canal. The general perception of all water users in the LORWUA is that the quality of canal water is very good (L1, EKB1, 2 and 3). The water quality of the canal is currently monitored by LORWUA and the only sources of pollution in the canal come from dead animals and occasional raw sewage spilling (two cases were reported in 2002, L1). According to L1, LORWUA resolved the situation quickly with no danger to human health. Some HDIs from the Ebenhaezer community are still drinking directly from the canal (EKB2). Indeed, given the unstable water supply for irrigation to the Ebenhaezer small-scale farmers, some irrigators sometimes use their quota of free basic domestic water (6 m3/month/household) for irrigation. When they discovered that they must pay for additional water used, they started using raw canal water for domestic purposes to save on water bills from Matsikama Municipality (MM). This was still happening in April 2003 (EKB2). Water Quality in the Olifants River The water quality of the river itself is very good upstream of the Bulshoek Dam. However, from there and particularly downstream of Lutzville, nitrification becomes a problem (CNC1 and L3). The DWAF is currently monitoring the water weekly but, after the Catchment Management Agency (CMA) is constituted, it will become LORWUA’s responsibility. During the dry periods of the year, in March and April just after the irrigation season, the river is at its most polluted. (No water extraction directly from the river for domestic use was recorded.) There are from time to time signs of high levels of Escherichia coli in the river. However, this is a very common natural bacteria and it only becomes a problem when a certain level of bacterial activity is reached, which is not the case in the Olifants River. Effluents from commercial farms are also a problem in the winter months because drip irrigation is by far the most widely used irrigation technique. Although it is extremely economical and the water savings per hectare are substantial, one of the drawbacks of drip irrigation is that land under this type of irrigation tends to build up high levels of nitrophosphates and other fertilizers in the irrigation season. Indeed, the maximum volume of water that can be applied to a specific piece of land in a given time period is extremely limited--therefore the land cannot be regularly ‘flushed’ (as with overhead impact sprinklers) to get rid of these fertilizers. With the first rains, most of these lands are ‘flushed’ naturally (it is sandy, well-drained land) of the fertilizer that was applied in summer. The result is that this fertilizer-rich, effluent water drains into the river, and saturate it with nutrients so that there is a sharp increase in the aquatic micro fauna and flora. This boom in micro populations starves the water of oxygen and, after one or two weeks, in mid-April, oxygen levels drop too low to sustain the high level of micro- organisms. Soon after, the water turns a deep green color and has a bad odor, as the result of the micro-organisms dying because of oxygen starvation. This condition lasts for a maximum of one month until the balance between aquatic life and oxygen is re-established or when the winter floods come. The danger, however, is that there can be a loss of species and, therefore, a loss in biodiversity for the local area (CNC1). 10 The soil of this area is sandy and hence naturally well drained, but it also erodes quite fast. The bulk of erosion takes place in winter when the river floods its floodplain. Most of the vineyards in the floodplain are not accessible until the beginning of September (almost a month after the rainfall season). During the flood period, a lot of fertile topsoil is eroded and lost to the sea. This process is natural, but Cape Nature Conservation and the commercial farmers try to limit this type of erosion by building wire baskets filled with rocks to stabilize the riverbank. Some ecologists do not like the idea of riverbank stabilization, but it is currently the best practice available (CNC1). The Transformation of the Irrigation Board into a Water User Association The Vredendal Irrigation Board acted as the founding organization for the LORWUA. As required in the guidelines for the transformation from IB to WUA (DWAF 2000), emphasis has been placed on ensuring racial and gender representation in the constitution. Currently, there are five colored representatives on the LORWUA Management Committee (MC), of whom four represent the HDI water users. The total number of members on the MC according to the constitution is 16, constituted as follows: • Eight persons from the eight CF subdistricts that had water rights under the previous IB; • One person from the EKB; • Two persons representing the farm workers;5 • One person representing the MM; • One person representing the West Coast District Municipality (WDM); • Two persons representing industrial users; and • One person representing small-scale farmers around Vredendal (hereafter VSB). Candidates were elected through a process of nomination on 23 March 2000. Since training and capacity building is essential for HDI representatives, this is currently done in Clanwilliam by the DWAF through courses in WUA management and the intricate nature of the laws that govern HDI areas and their water rights (in particular the EKB). Water Management in the Lower Olifants Water User Association Current Management The area of jurisdiction of the LORWUA includes properties using water from sources not affected by the existing canal, as well as the previous Vredendal IB management operational area. Hence, users that extract water directly from the river during winter, as well as groundwater users, who were not part of the former Vredendal IB (like the Lutlouw equity share scheme), are now included in the LORWUA (Constitution 2000: 6). Even though the Lutlouw Scheme has no direct contact with the canal system, the LORWUA acts as guardian over the scheme (LORWUA Constitution 2000: 3-4). 5The LORWUA constitution refers to these representatives as household users (LORWUA constitution, 2000:6 and L1). Although somewhat confusing, it was confirmed by L1 that household users actually refer to farm workers. 11 The LORWUA no longer receives financial assistance from the DWAF. The only assistance it might receive would be in the form of loans for possible major infrastructure developments (L1). The DWAF is still responsible for the maintenance of the dam, but LORWUA takes charge of the daily operation of the sluice gates. Currently all of the sluice gates are in need of repair and any infrastructure-related costs, like upgrading and major repairs to sluice gates, are the DWAF responsibility until the dam is in a proper state for the transfer (L1). There are 16 sluice gates at the Bulshoek Dam, all of which were in a very poor state until the DWAF replaced 15 of them with new gates. The newly installed gates do not have the correct overhead gear and are currently not operational. The last old gate also needs to be replaced (L1). In the near future, however, Bulshoek Dam should become LORWUA’s full responsibility. The LORWUA is responsible for the operation and management of the existing waterworks infrastructure at the Bulshoek Dam, and for the water distribution system from Bulshoek to the Ebenhaezer community and Koekenaap (L1). It is not responsible for managing the internal distribution system of the EKB. The canal is operated on a demand-based system whereby the total demand of the LORWUA users is requested daily from the Clanwilliam Dam (outside the LORWUA management area). The Bulshoek Dam is used mainly as a balance dam for the canal. Special authorization is needed for LORWUA users to pump directly from the river (L1). Irrigation water cost roughly R1,537/ha/yr in 2003.6 Two quotas are used in the LORWUA, namely a yearly quota of 12,200 m3/ha and a weekly quota. The weekly quota, also called maximum extraction rate, is equal to 325 m3/ha for all irrigators. No irrigator is allowed to demand more than the maximum extraction rate and no cross-substitution between weeks is allowed (i.e., an irrigator is not allowed to receive 200 m3/ha one week and 450 m3/ha the next week), because of the limited carrying capacity of the canal. All registered irrigation users in the LORWUA are theoretically entitled to 12,200 m3/ha/yr (this amount was determined on 15 April 1983). The theoretical figure of 12,200 m3/ha/yr must be understood in terms of a total available volume because, since 1998, water has not been linked to land any more and each farmer can farm on whatever land area he wants, as long as he/she does not use more than his/her total volumetric quota. However, the actual yearly quota is often reduced after an annual estimation of the amount of water present in the Clanwilliam Dam in October/November each year. It seldom happens that the yearly quota is really 12,200 m3/ha. The canal operates for 40 weeks in the year (it varies actually between 38 and 42 weeks). Therefore, during normal years, when farmers get their full annual quota, the two quotas amount to the same volume of water: 40 * 325 = 13,000 cubic meters. However, when the annual quota is lower (e.g., 8,133 m3/ha in 2002), the farmer has to take the annual quota into account when making his/her weekly water demands. IWRM in the WUA The transformation process is still not complete with regard to the transfer of the DWAF staff to the LORWUA. This hampers the ability of the LORWUA to practice IWRM properly on its own. The result is that, at this stage, no clear-cut distinction could be made between IWRM from the DWAF, and IWRM from the LORWUA, because the personnel of 6In 2003, ZAR1.00 = approximately US$0.12. 12 these two organizations are currently shared. The transfer of personnel from the DWAF to the LORWUA is currently the LORWUA’s most important issue (L2 and L3). The LORWUA would like to incorporate the irrigators from the mid-section of the Olifants River, i.e., those upstream of the LORWUA, where there is a small canal between the Clanwilliam and Bulshoek dams with users who have canal rights and river pumping rights. However, these farmers are not keen to join the LORWUA, probably because of the price difference between the fees paid to LORWUA (R1,537/ha/yr) and their fees. Currently these users pay R236/ha/yr for their water and they maintain their own canal. According to L1, these water users do not have to pay high water prices because their infrastructure differs significantly from the LORWUA canal that carries water from the Bulshoek Dam. Water Management and the Promotion of HDIs in the LORWUA Among the fundamental purposes of the 1998 NWA are the aims of meeting basic human water-related needs and promoting equitable access to water resources (1998 NWA, section 2). The extent to which these HDIs are accommodated in the LORWUA will be discussed in the following subsections. The first two subsections describe HDIs’ needs in general and their needs with regard to water. Then the EKB’s main problems are assessed, and the last subsection analyses the LORWUA’s ability to tackle these problems. HDIs’ Needs in General In both the EKB and the VSB, a water user was asked to rank the problems faced by the community. Although interviewing only one user limits a priori the capacity of extending the results to the whole community, the interviewees were asked about general water-related problems, which all users usually face. The following figure 4 is a graphical representation of the needs of the two groups. Figure 4. General needs of the EKB and the VSB. 0 1 2 3 4 5 6 7 Land tenure security, to access credit Market access Extension Low marginsWater needs Collective management issues w ithin the scheme Need more land VSB EKB community 13 Respondents to the interviews were asked to rank seven types of farming-related needs from most important (7) to least important (1). The graph shows a similar pattern for the problems of the EKB and the VSB. It appears that acquiring additional land is a high priority for the EKB. This was also mentioned in the interviews: The 1.6 hectares per small-scale farmer is considered too small an area for a sustainable livelihood. The most important need for the VSB is with regard to access to credit because all the funds received for their project are already invested in the demarcated land. The fact that low margins, market access and water needs are not ranked high does not mean that they are not important. The EKB argue that land-related problems enjoy priority. HDIs’ Needs with Regard to Water Farm workers on commercial farms are supposed to participate in the decision-making process in LORWUA via two representatives at all MC meetings, so that this participation could be a launching pad for discussing the needs of farm workers. However, each CF is supposed to provide his/her farm workers with all their water needs, which include safe drinking water and proper sanitation and, since the farm workers do not farm themselves in the LORWUA area of jurisdiction, no needs were identified with regard to their access to irrigation water. The following figure 5 is a graphical display of a assessment of the needs of the HDIs in the EKB and the VSB. Figure 5. Water-related needs of the EKB and the VSB. Both persons interviewed marked funds for infrastructure and funds for water distribution fees as important. The VSB farmer marked the acquisition of additional water licenses as his most important need. This could be because the VSB buy their water from the Matsikama Municipality and pay marginally higher tariffs for irrigation water than CFs (VSB1). The EKB farmer did not rate additional water licenses as important because he thought that the 0 1 2 3 4 5 6 Funds for infrastructure Funds to pay for water distribution fees Acquiring additional water licences Part of the day-to-day management Entitled volume of water Acceptable water quality VSB EKB community 14 problem was not that they needed more water rights, but rather that they were not receiving the amount of water they were entitled to. The two persons interviewed rated participation in the daily management of the LORWUA as not important. The VSB farmers are represented in the LORWUA and they have few problems with the management of the association. Water quality is not a problem for the VSB because they are quite high up in the canal compared to EKB. Water quality problems are stated to be of relative importance to the EKB, but they were dominated by water supply problems within the EKB. The EKB ranked entitled volume of water as very important because, although they do have an entitlement to water, there are some fundamental problems regarding the definition and supply of the water. Therefore, the single most important need identified by the member of the EKB was related to an inadequate supply of water. Inadequate water supply could refer to the total volume of water received over a given period or to the regularity of the water supply over a given period. Within the EKB, variable water supply is a greater problem than the total volume of water received over the year. The problem is that the area where the LORWUA operates is subjected to extremely high evaporation losses during the transport of the water along the 280 kilometers of open concrete canal. All the variations of flow, due not only to evaporation, but also to canal leakages, canal breaks, water theft and difficulties in management, have an impact at the tail-end of the canal. The ability of the LORWUA management to release the exact volume of water from the Bulshoek Dam to satisfy water demands in districts 7 and 8 (farthest from the Bulshoek Dam), is a to a great extent a function of their ability to predict the weather accurately. Evaporation alone is sometimes responsible for losing up to 35 percent of the total volume of the canal (L1). It is, therefore, difficult to supply water users at the end of the canal (districts 7 and 8 as well as the EKB) with a steady supply of water. In order to smooth the water supply to these users, a small balance dam is in the final planning phases, construction of which started in April 2003. Major Problems Faced by the Ebenhaezer Community The abovementioned water-related needs of the EKB can be grouped into three main areas: • Canal flow • Canal management • Leadership and participation in the LORWUA MC Do the EKB Farmers Receive the Canal Flow They Are Entitled To? According to the 1925 Act, the EKB farmers are entitled to enough water to irrigate 257 hectares (confirmed by the LORWUA entitlement document, 2000:8). However, several elements make EKB water use different from CFs. First, though EKB farmers are entitled to a given annual volume, they do not get water on a demand basis as other commercial farmers do; and second, the entitlement of EKB is, according to Act 14 of 1925, only for irrigation purposes, but this water is currently also used for domestic purposes. Since they are situated on the downstream part of the canal, they receive all unused flow from the CFs upstream and the LORWUA tries to make sure that they receive a steady flow. Within the EKB entitlement for 257 hectares in the LORWUA, a change was made because EKB is an ‘end canal’ user and they receive surplus water (in this document, the surplus 15 water is defined as the difference between the actual flow and the scheduled one at the entry --distribution point--of Ebenhaezer). Therefore, the IB has limited the initial quota of EKB from 12,200 m3/ha/yr to 10,460 m3/ha/yr (i.e., a 14 percent reduction). The translation of the initial annual quota in a reading of the meter at the entrance of Ebenhaezer is summarized in table 2 below. Table 2. EKB theoretical entitlement to irrigation water. Entitlement Total enlisted hectares (m3/ha/year) 10,460.00 257.00 Total water entitled Water entitled per week Entitled flow 400 m3/hour traslated to 2-foot Parshall meter reading (m3/257ha/year) (m3) (m3/ha) 268,220.00 67,205.50 400.03 195.2 points It must be noted that the abovementioned 192.5 points is a theoretical reading, given that there is no decrease in the general annual water quota.7 Since 1998, the West Coast District Municipality (WDM) received a right to use surplus water but, though WDM theoretically has a right to surplus water only, they are, in fact, a user of highest priority, which can become of importance during periods of low water flow. This priority is put into practice through the design of canal management within Ebenhaezer, which ensures that domestic use will be served first. Therefore, even if the domestic consumption is on average only 8 percent of the total water demand, it can have a significant effect on irrigation in periods of scarcity. There is indeed ample surplus water flowing past the LORWUA EKB meter (MM3). However, LORWUA calculations are based on the assumption that users will withdraw water from the canal night and day but the EKB cannot do this because they can only practice flood irrigation during the day, and they do not have a dam to store the unused water for use during the day. Although it may seem that some additional surplus water is created by the fact that EKB farmers do not irrigate at night, therefore creating unused water at night, this is not surplus water, but quota water that is wasted. The reduction of the theoretical EKB entitlement in the LORWUA is, therefore, questionable and, by deciding on a theoretical flow of 10,460 m3/ha/yr (192.5 points on the LORWUA EKB meter), the LORWUA makes the following dubious choices: 1. Not giving the EKB farmers the opportunity to irrigate on a demand basis (confirmed by EKB3); 2. Reducing the theoretical annual quota of 12,200 m3/ha/yr to 10,460 m3/ha/yr because EKB is an end canal water user without legal grounds for doing so; 7The 192.5 points could be much less because, at the beginning of each irrigation season, a projection is made of what the quota per hectare for that particular year will be. The reading on the 2-foot Parshall meter for the EKB, with a restriction of 8,133 m3/ha/yr in the LORWUA, would be as follows: 257 hectares * 8,133/42 weeks/168 hours = 296 m3/hour or, according to the 2-foot Parshall meter table, 158.5 points (This procedure is exactly the same for all water users in the LORWUA). It is, however, not clear whether an additional 14 percent is deducted from the 158.5 points for EKB. 16 3. Discounting the fact that EKB farmers do not have storage facilities to make use of the night flow (except for the small Olifantsdrift balance dam). However, it must be noted that many CFs practice flood irrigation on a 24-hour basis; and 4. Not taking into account requirements for WDM and Ebenhaezer community domestic water, which should receive higher priority than all irrigation rights in LORWUA, and hence lead to a greater flow at the LORWUA EKB meter. Moreover, in the rationale for the decrease of the EKB quota, the surplus water argument has been used twice: first to decrease the amount of water given to the EKB, and second to supply the WDM with domestic water. The Actual Flow Received by EKB The previous subsection explained the EKB entitlement: This section analyses the volume of water the EKB actually receives. The only data available for determining the flow towards EKB is the measuring point at the LORWUA EKB meter just upstream of the main distribution point (figure 9). The EKB is one of three water users who receive water that flows past the LORWUA EKB meter. The others are the WDM (for the domestic use of Strandfontein, Doornbaai, Viswater and Papendorp), and the MM for the domestic use of Ebenhaezer community, which includes the town of Ebenhaezer and a Reconstruction and Development Program settlement downstream of the Olifantsdrift Dam. This meter is the last meter where canal flow is accurately measured and the main distribution point is downstream from this meter. Therefore, the only way to estimate the volume of water EKB is receiving for irrigation purposes is to deduct the domestic use of the WDM and the MM (measured at the water purification works of the WDM) from the volume that flows past the LORWUA EKB meter (MM3). Figure 6 below is a graphical display of the total weekly flow measured at the LORWUA EKB meter from October 1993 until October 2002. The following remarks are important before trying to draw any conclusions from this graph: • The graph is based on the total weekly flow (approximated, since it is based on only one weekly measure) from October 1993 to December 2002. • The measuring system of the LORWUA was only computerized in 2001 so no surplus flow data was available between March 1999 and July 2000. The graph indicates the total flow past the LORWUA EKB meter, as well as a 50-week (yearly) moving average of the flow (the periods when the canal was and when data are missing are taken into account). The weekly quota (67,200 m3) for which the meter is registered is also indicated (refer to the horizontal line at 67,200 m3). Note the sudden yearly drops in the total flow due to canal maintenance, during which no water is available for the water users. According to L1, the canal is active for roughly 40 weeks of the year. The yearly moving average starts to decrease after October 1997 and intersects the registered quota at roughly October 1998. From there, the moving average is less than the quota (but note that no surplus data were available after March 1999) until it starts to increase again after September 2000 and intersects again with the quota on December 2000. It does not, however, increase to its previous level from before October 1997. This indicates a fall in surplus as from October 1997, and therefore a fall in flow past that point. There are large variations in surplus flows, i.e., in flow above 67,200 cubic meters per week. 17 The decline in the difference between total flow and the quota past the EKB point after October 1997 suggests a reduction of the surplus, which in turn suggests an increase in commercial agricultural irrigation upstream. The main possible explanation is that, after 1998, commercial farmers were no longer constrained to irrigate a specific area and they made the maximum use of their water entitlement. (Note that no additional water use rights were issued after 1998.) Figure 6. Total flow arriving at the entry of the EKB. EKB- Total flow (1994-2002) 0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000 90,000 100,000 110,000 120,000 130,000 140,000 150,000 160,000 170,000 180,000 190,000 200,000 210,000 220,000 O ct -9 3 Ap r- 94 O ct -9 4 Ap r- 95 O ct -9 5 Ap r- 96 O ct -9 6 Ap r- 97 O ct -9 7 Ap r- 98 O ct -9 8 Ap r- 99 O ct -9 9 Ap r- 00 O ct -0 0 Ap r- 01 O ct -0 1 Ap r- 02 O ct -0 2 W ee kl y flo w (m 3 ) EKB weekly quota per year 50-week moving average Suggested quota for peak season Total weekly flow The following table 3 and figure 7 analyze in more detail figure 6. Table 3 includes the standard deviation and average flow for 1994–2000, but only for periods when the canal was in operation. During this time, the average quota received past the point was 64,232 m3/week. Average total flow is 92,550 cubic meters for the period, but recall that EKB is not the only user of the water that flows past the LORWUA EKB meter. The question should, therefore, be whether the difference in total flow and the full quota is enough for all other uses that take priority over irrigation. Table 3. Weekly flow for the LORWUA EKB meter. Weekly flow 1994–2000 (m3) Quota Surplus Total Average 64,232 46,076 9,255 Standard deviation 9,178 26,011 32,742 18 Figure 7. Average weekly flow with Standard Deviation at the EKB meter. 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 1994 1995 1996 1997 1998 1999 Fl ow (m 3 ) Quota Surplus Total weekly flow (Quota + surplus) The standard deviation of 26,011 indicates a very unstable supply of surplus water. The probability of a non-existent (or even negative) surplus is therefore considerable, which explains the current conflict between irrigation and domestic uses. Figure 7 indicates the average weekly flow per year. The standard deviation of each year is also indicated (as said earlier, no surplus data were available after 1999 and some surplus data were missing for 1999). The annual standard deviation of the surplus almost equals the range of the surplus during the same year. This indicates an unstable surplus and that any water use right based on surplus water should be questioned. Note the small standard deviation for the quota: This suggests a stable quota for the EKB, but recall that this graph is of total weekly flow and that variation in supply within the week is not shown. Comparison With the Needs of EKB. The next step of the analysis is to compare the flow arriving in EKB with the water needs of EKB, especially during the peak period. The water needs at the EKB meter are based on domestic needs as well as irrigation needs. Beans and lucerne were identified as the two main crops under irrigation in Ebenhaezer. The planting season for beans starts at the beginning of April and the harvest time is roughly in August. A second season for beans starts in October of the same year, with harvest at the end of February. Lucerne usually follows. The April to August season is in the winter and evapotranspiration losses are much less than in the summer season. The following figure 8 is a short summary of a typical irrigation season for this area. Figure 8. Cropping pattern in the EKB. Roughly 6,370 cubic meters are needed to flood irrigate 1.6 hectares of beans for the whole winter season (150 days) (WCDoA1). This figure is substantially higher for the summer season, when 15,380 cubic meters of water are needed to flood irrigate 1.6 hectares in the October to February planting season. Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec winter beans summer beans summer beans lucerne 19 For lucerne, more water is needed. A volume of 21,020 cubic meters of water are needed to flood irrigate 1.6 hectares of lucerne for one year in order to harvest the crop to its full potential. If the EFs irrigate less, the lucerne still yields a harvest but not to its full potential. What normally happens in Ebenhaezer is that the farmers irrigate what they can and hope for the best. Harvest time for lucerne is December/January when it is cut and baled (WCDoA1). The following graph (figure 9) displays the irrigation needs during a typical year in the EKB area (WCDoA1). The graph has been drawn for 257 hectares of irrigated land with an assumed 50 percent beans and 50 percent lucerne. An irrigation efficiency of 0.65 was used to take into account flood irrigation. Figure 9 indicates a clear peak season from October to February because beans need relatively little water in the winter planting season, which is from April to August. Figure 9. EKB monthly crop water requirements. 0 100,000 200,000 300,000 400,000 500,000 600,000 700,000 800,000 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep m 3 /2 57 ha beans w inter / 257ha beans summer / 257ha lucerne / 257ha TOTAL / 257ha The following graph (figure 10) is based on the previous one, but displays the total weekly irrigation need for the EKB (257 ha). The dotted line indicates the quota from LORWUA (for all water uses served by the meter). All surplus water should be added to the quota before comparisons between the need and the quota can be made. Figure 10. EKB weekly irrigation requirement. 0 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep m 3 /w ee k Total 257ha/week Registered qouta 20 The following table 4 represents all water uses at the LORWUA EKB meter and could be seen as a summary of all water needs for the EKB measuring point during times of peak demand. While the irrigation needs are based on detailed crop water requirements obtained from Elsenburg Agricultural College, Western Cape, the domestic need is based on actual water usage obtained from the MM. With the current system, the EKB small-scale farmers are entitled to 400 m3/hr (the deduction of 46 m3/hr for domestic use is considered to be buffered on average by the surplus). Flood irrigation is only practiced in daylight, therefore, an effective irrigation period of 12 hours a day is assumed. Hence, a maximum of 48,00 m3/day = 33,600 m3/week is available for irrigation. It is currently practically impossible to supply EKB with 67,200m3/week only in daytime because the canal operates on a 24-hour basis. Therefore, roughly half of the EKB small farmer entitlement is wasted as ‘surplus’ water during the night due to insufficient storage capacity. From table 4, it is possible to calculate that, given the current water supply, a maximum of 90 EKB small-scale farmers could be accommodated in the peak time (given the first assumption of the table). Mainly because of this water deficiency, only 56 EKB small-scale farmers are still active on 126 hectares of the original enlisted 257 hectares (WCDoA1). Table 4. Water need at EKB measuring point in the peak season. Flood irrigation in EKB Crop Season Total water need for 1.6 ha Farmers Need (m3) # (m3) (points) Beans Lucerne Oct-Feb Nov-Feb 15,382 10,090 75 75 1,153,650 756,713 Subtotal Total domestic use in EKB (in peak season)2 Total domestic use for WDM (in peak season)2 Total use (m3 in peak season) 1,910,363 74,691 53,990 2,039,044 Total need in peak season3 Irrigation need in peak season Domestic need in peak season Total need in peak season3 Water received past EKB meter in peak season4 Shortage in peak season (m3/week) (m3 /hour) (m3 /hour) (m3 /hour) (m3 /hour) (m3 /hour) 119,944 669 45 714 458 256 261.00 4.70 280.00 210.00 1Note that the assumption was made that half the farmers plant lucerne and the other half plant beans. In reality farmers plant both crops, but on half their land. Another important point to note is that, according to the DoA, only 56 of the original 150 farmers (or 126 hectares) are still active today, so the stated water needs will be smaller in reality. 2Based on Matsikama Municipality data for 2001 (peak season is 17 weeks: Nov-Feb). 3That is, 2,039,044/17 weeks/7days/24 hours. 4Based on LORWUA flow meter readings at EKB. 21 To conclude, there is evidence that the current water supply is insufficient for the following reasons: 1. The water right of EKB was reduced by almost 15 percent; 2. It is difficult to schedule the use of surplus water; 3. EKB farmers cannot make use of their full quota; 4. The practice of flood irrigation is not suitable for a water scarce area; and 5. Domestic use is steadily growing. Note that the total volume of water is not mentioned here, because EKB does indeed receive more than their quota on a yearly basis. Internal Management of Water Allocation Within Ebenhaezer It is also necessary to assess the internal management of the water allocation within the EKB. If it appears that mismanagement of the internal canal system is to blame for extreme water losses in the community, it may be necessary to tackle these internal problems first. This analysis will be reported by first explaining the physical infrastructure of the EKB canal system and then the management of the system. Afterwards, the main problems that could lead to water losses will be discussed. Lastly, some suggestions will be made for addressing these problems. The following sketch (figure 11) illustrates the internal distribution system of EKB. It is important to note that there is no official drawing of the canal infrastructure and this sketch is a copy obtained from the SPP. Figure 11. Schematic description of the canal network within the EKB. 22 Description of the Waterworks The LORWUA canal splits downstream of Klawer to the left- and right-hand sides of the river. The canal towards EKB is part of the left branch of the canal. There are nine sluice gates in the main canal to EKB (5,000 m long). All the sluice gates are connected to primitive internal earthen canals with secondary sluice gates. These secondary canals are not lined with concrete and transportation losses are extremely high due to infiltration in the canal itself (note that the secondary canals are made of sand and drainage losses are extreme), canal breaks, and lack of maintenance within the EKB group. LORWUA canal water enters the system directly from the main canal through the LORWUA measuring point. This is the last time irrigation water is measured (refer to figure 11). The water is distributed at the main distribution point to the surplus water dam used for the communal farm of the Department of Agriculture (DoA) (WCDoA1), to the second main sluice gate, and to the rest of the canal. The canal between the distribution point and the second sluice gate is also an earthen canal. Water for domestic uses is extracted from the canal between the EKB distribution point and sluice gate 1. The purification works service all the EKB domestic needs, as well as the domestic needs of Doornbaai, Papendorp, and Strandfontein. The WDM installed two reservoirs, from which the purification network starts. An employee of the WDM is permanently stationed there and manages the sluice gates at the distribution point to ensure that there is always enough water for the purification network. The use of drinking water for both Ebenhaezer (who received their first purified water in 1996, MM3) and Strandfontein is not formalized with LORWUA. WDM uses surplus water but they have a use of higher priority relative to EKB farmers and, as mentioned before, this surplus water has also been dedicated to EKB to be able to decrease the scheduled flow. There is currently no measure of how much water really goes to the purification network. This extraction by WDM (with a right to surplus water only) is a source of conflict between WDM and EKB. Sluice gate 1 is linked to an underground pipe that services its users. The church also receives its water via a pipeline, with the water coming from one of the Transitional Local Council dams (SPP1). The church is the only irrigator that receives water directly from a dam and, hence, has a very stable water supply. Sluice gate 3 is situated on a natural bend with a steep gradient to the fields below so that, when this gate is opened, the rate of delivering to the other gates (it depends on the routine but it is normally gate 4 or 5) falls dramatically. Therefore, the management of gate 3 is a source of internal conflict between irrigators. Gates 4, to 9 follow on from gate 3. The canal ends in the Olifantsdrift Dam, which is used as a balance dam for gate 9. It was suggested by the SPP that this dam should be filled in the night, when the EKB irrigators do not irrigate, for use as irrigation dam by the gate 9 users (SPP1). This worked, but some problems are currently experienced because not all irrigators abide by this rule. Management of the Canal A water management committee is responsible for the management of the internal distribution system of EKB. Within the EKB, only the water right holders are allowed to manage canal sluice gates. In the past, there was enough water even in times of peak demand and, hence, no specific system of allocation was set up. More recently, because of the increase in water scarcity, on the recommendation of the SPP, a water-bailiff was appointed to assist with and check on the water allocation cycle. Each irrigator is responsible for opening and closing his 23 own sluice gate. No locks or clips8 are used and the success of the system is entirely dependent on the cooperation of the irrigators. This has proven to be a very fragile management system and is certainly one of the main reasons for conflicts in the EKB. SPP tried to set up management of the sluice gates based on a time schedule with a watering cycle of one-and-a-half weeks. Each irrigator would be granted a fixed period for watering his crops, disregarding the actual flow. However, the unstable water supply has meant that a system based on timing did not deliver equal volumes of water to each irrigator and this was problematic (EKB1, EKB2 and EKB3). A second strategy was proposed by the SPP (SPP1), where each irrigator irrigates his/her land until saturated and then passes the turn to the next irrigator. The consequence was that the watering cycle on average became 3 weeks. This was much too long for cash crops and bad harvests with a low morale among farmers became the norm. Roughly 90 percent of the EKB at present are members of the Verenigende Gereformeerde Kerk (VGK) church. Since the EKB originated from a mission, the church was always respected as the moral and ethical caregiver. Members of the church who had water rights shared their water with the church, so that the church would remain functional within the EKB. Nevertheless, over the years, the link between the church and the community has been eroded. The ‘Exchange of Land Act’ (Act 14 of 1925) stated that water right holders could receive free irrigation water in exchange for free labor to maintain the canal. Initially, the agreement was respected from both sides. However, in more recent times, social links within the community weakened, and problems were experienced in obtaining sufficient labor for maintenance and upgrading of their canal system. Role of the New Dam In 1997, a project was initiated by some CFs to try to help the EKB develop some additional agricultural land (WCDoA2). The idea was an equity-sharing project similar to that of the Lutlouw equity-sharing project. This project identified the need for a dam and R1,450,000 was made available from the DoA to upgrade the current canal system and to build a dam. However, the community of Ebenhaezer did not want to go further with the scheme because it mistrusted the intentions of the CFs and, so the project was terminated. The money is still available at the DoA. This same funding was made available for the construction of a new dam at EKB. This newly proposed balance dam is a joint project of the DWAF, DoA, WDM, and LORWUA. It was initiated by the LORWUA but mainly developed by the DoA. The motivation and stakeholders of the new dam are as follows: • Stabilizing the flow for EKB (257 ha); • Stabilizing the flow for CFs in district 7 (71 ha); and • Domestic use for EKB, Doornbaai, Papendorp, and Strandfontein. The DWAF will be responsible for the construction of the new dam upstream of Ebenhaezer. It will have a volume of 140,000 cubic meters and not the original 203,000 cubic meters proposed (WCDoA2). The dam will be 198 x 198 x 6 meters and will be waterproofed with high-density polyethylene hexane. It will serve as a balance dam to smooth out the supply of water to the LORWUA EKB water meter. After the completion of 8 ‘Clips’ refer to the calibration system of built-in canal meter boxes. 24 the dam, it would make sense to reintroduce the time scheduling in the EKB to try to give each irrigator an equal volume of water per hectare. According to WCDoA2, the most important determinant of the volume of the dam was the variation in water supply relative to the total volume flowing past the LORWUA EKB meter. Crop water requirements did play a part in the determination of the volume, but past and projected surplus water played the dominant role. The financing of the project will be done as per table 5 below: Table 5. Financing of the EKB balance dam. Source Contributes DWAF DoA WDM LORWUA EKB Construction Lump sum of R1,450,000 Will be billed directly Management and maintenance Dam site Source: WCDoA2 Total cost of the dam is estimated at R4,450,000 (WCDoA2), the remaining R3,000,000 being paid by the DWAF and the WDM. Conclusion This analysis showed that water demand exceeds water supply at the LORWUA EKB meter during the peak demand period of November to February. There is an extreme variation in the supply of surplus water, which leaves rights to surplus water during peak times of little value. There should be a revision of water rights to ensure proper entitlement to domestic water use because water use rights based on surplus water are not clearly defined. The new dam will enable EKB to benefit from the night flow and will be used as a stabilizing dam for the irrigation needs of the EKB. However, the dam is not large and it is not certain whether the dam will have storage capacity for enough water to cater for long low-flow periods. An alternative could be to increase the water use efficiency, given the same water supply. This argument suggests the importation of more efficient irrigation technology (like a pressurized water supply and drip or sprinkle irrigation), but requires considerable capital outlay.9 The fact that EKB makes use of flood irrigation (with an efficiency coefficient of 0.65) is important since drip irrigation (with an efficiency coefficient of roughly 0.85) could have enormous savings in total water usage. However, the cropping pattern must be kept in mind, i.e., beans are not irrigable under drip irrigation (but sprinklers could be used). Another solution could be to put aside a given minimum flow for the WDM (based on projected domestic supply) and then to help EKB set up a demand management system. Some infrastructure-related operations have already started, according to an action plan proposed by the MM (MM3). This plan consists water distribution,10 canal maintenance (R14,000,000), and the new balance dam. A decision was taken to repair the canal system, 9 The replacement of the entire open canal system of EKB with a closed pressurized system is also in the planning phases (this project is also initiated by the LORWUA) (L1). 10 Water distribution includes the completion of distribution boxes in EKB, the installation of measuring points, calibration of the system, maintenance, and permanent personnel for managing the canal in EKB. 25 through a 3-year program (2001–2003) with a total budget of R800,000 financed by Land Care, a program financed by the Department of Agriculture. During this initiative, several actions have been taken: • removal of trees along the canal; • lining the main canal with concrete; and • hiring of a water bailiff from October to March to organize the distribution of water. Repair of the broken sluice gates has not been completed due to insufficient funding. Do HDI Representatives Actively Participate in the LORWUA Management Committee? Language is certainly no obstacle since all the people speak Afrikaans. Currently, all members of the MC are men, with the exception of one of the two farm-worker representatives. None of the HDI representatives had a detailed knowledge of the 1998 NWA, and the responsibilities of the LORWUA or the future CMA. Overall, HDI representation in the LORWUA MC is currently not very active. At a MC meeting on 20 March 2003, the only HDIs present were one person from Ebenhaezer--but not the formal representative--and one of the two farm-worker representatives. VSB The representative of Vredendal small-scale farmers speaks for seven small-scale farmers. He is generally present at all LORWUA MC meetings (L1 and L3). However, the link between the representative and the rest of the small-scale farmers is not clear. His ability to actively participate is still hampered by a lack of experience and knowledge of commercial farming practice (L1 and L3), although small-scale farmers do feel part of the management of LORWUA and would like to play an important role in the general promotion of HDIs (VSB1). However, it was clear that some capacity building with regard to the current responsibilities of the LORWUA and the CMA is still needed. EKB The active participation of the EKB is problematic, because the representative of the EKB no longer attends MC meetings due to an imbalance of voting power (EKB1). The status of the EKB with regard to membership of LORWUA is also uncertain. According to the constitution (LORWUA 2000: 6), the EKB do have a representative on the LORWUA MC but the EKB is not officially part of the WUA. Therefore, there is uncertainty regarding the leadership and representation of the EKB in the LORWUA MC. Mutual mistrust, history and politics play an important role in the inability of the EKB to identify a representative for the LORWUA MC. There have been several initiatives from LORWUA to try to mobilize the EKB to elect a representative, and the SPP also played a leading role in this regard (SPP1) but, so far, the success of such initiatives has been limited. Farm Workers The presence of the farm-worker representatives did not lead to any explicit changes for this group of users, for two reasons. First, there is no organization within the farm-workers’ community: The farm-workers representatives do not know much more than what is happening on the farm where they are working. Second, the farm workers in the LORWUA do not face major problems with respect to water (FW1). 26 The Ability of the LORWUA to Address These Problems The EKB is a water user with a minority of water use rights. Their main problem is to make sure that they obtain their entitled water rights. The answer to this problem lies in monitoring of their entitlement, either through a monitoring organization like the DWAF or by installing proper monitoring equipment in the EKB. The LORWUA could do the latter. At a meeting between the LORWUA and the EKB on 9 April 2003, both parties agreed to propose an action plan to upgrade the EKB canal system. These proposed plans were to be discussed at a subsequent meeting. LORWUA currently has many staff problems, which hamper its ability to accommodate HDIs with regard to capacity building. The manager of the WUA actively tried to reach out to the EKB to help them organize themselves and to identify a legitimate leader to represent them in the LORWUA. Communication between HDIs and their representatives at the MC was identified as a problem, and that the LORWUA could help these representatives to communicate clearly with their right holders, and assist in organizing the HDI groups. There are currently no training programs in good irrigation practices and water management administered by the LORWUA. However, according to L1, the local CFs play a very important role in the transfer of knowledge and practical expertise to the small- farmers in particular (confirmed by SVB1 and EKB3). Apart from the initiatives from the CF, the DWAF and the DoA are currently the main role players in capacity building. L1 foresaw that LORWUA would only start playing a leading role when all its personnel have been transferred from the DWAF. Such capacity building initiatives should be enacted on EKB premises (and those of other HDIs) and not in far off places like Clanwilliam, because transport is a major constraint for HDIs. The new balance dam upstream of EKB will address the water supply problem of the EKB meter. The LORWUA will maintain and manage the dam free of charge for EKB (as the main beneficiary of the project). Other Relevant Issues for HDIs Internal Problems Within the EKB The community is organized around a committee established by the Transitional Local Council on 26 October 2000 in accordance with the Transformation of Certain Rural Areas Act (TRANCRAA), (Republic of South Africa. Act 94 of 1998), (SPP1). The TRANCRAA committee has the following subcommittees (Surplus People Project 2001:4-10): • Tourism • Mining and Fishing • Plots and Buildings • Agriculture • Land Claims • Communication In April 2003, the Ebenhaezer representative on the LORWUA MC was also the chairman of TRANCRAA, as well as chairperson of the following subcommittees: Land Claims Committee, Communications Committee, and Executive Committee. Moreover, at the December 2000 Municipal elections, the chairman of TRANSCRAA was elected as Councilor of Ward 1 of the MM (Ebenhaezer is only one area of Ward 1). Such 27 concentration of responsibility in one person proves to be problematic in addressing the internal conflicts faced by the EKB. Vagueness of LORWUA’s Responsibilities The responsibilities of LORWUA after the transformation process are clearly stated in the constitution (LORWUA 2000: 3-4), but the transformation process (which now is in its third year) is a one of slow development that will take some time to be completed. Throughout the study, some vagueness with regard to the delimitation of the current LORWUA responsibilities was identified. Two examples of such vagueness relate to monitoring of water quality and capacity building of HDIs . Monitoring of Water Quality According to the LORWUA business plan (2000:7), one of the principal functions of the LORWUA is to prevent any unlawful act likely to reduce the quality of water in any water resource within the area of jurisdiction. This certainly includes the river and the monitoring of water quality in the river, but no water quality management strategies could be found under the general maintenance and management strategies (LORWUA BP 2000:9-11). However, the DWAF will continue monitoring the water quality of the river until the CMA takes over. Capacity Building of HDIs According to the LORWUA business plan (2000:7), other functions of the association include providing management services, training and other support services to rural communities (HDIs). A separate point for HDIs was created in the LORWUA business plan (2000:14), where it is stated that assistance should be given to HDIs in the form of advice, planning, supply of small items, training in water distribution and costing. However, no activity had started yet in March 2003. The Land Claim Issue Land ownership among HDIs is an important issue. None of the small-scale farmers in the EKB is a landowner. Currently the EKB is busy negotiating a land claim with the LRC and, therefore, some details of this claim must be given. The whole area west of the Lutzville floodwater bridge was given to Ebenhaezer as a crown grant on 6 July 1837 by the British Crown (SPP1). Today, however, most of this land is occupied by commercial farmers. Moreover, some land was lost before 1913 and no claims can be accommodated for this loss. Ebenhaezer claimed their land or a R90 million monetary compensation but they were offered only R20 million. Ebenhaezer rejected the offer and wanted to take the matter to court. However, the service providers SPP and LRC agreed with the Land Claims Committee that EKB should think clearly on this matter. Instead of rejecting the R20 million, a solution could be to find additional land in compensation, to be added to the R20 million. The community worked out their strategy and instructed the committee to open lines of communication and to go for the best deal. It was stated that the TRANCRAA process must also be considered as part of the claim settlement package. 28 The Membership of EKB A last important issue is the official status of EKB membership of the LORWUA. It is clearly mentioned in the constitution (LORWUA 2000:6) that one MC member represents the EKB. However, according to the same constitution (LORWUA 2000:2), subdistrict 7 excludes the EKB and, EKB is not mentioned further in the delimitation of the LORWUA area of jurisdiction. In contrast, according to the LORWUA entitlement document (2003: 8), EKB is registered as user L150 for 257 hectares of irrigation water at the LORWUA. In the LORWUA Business Plan, the whole of section 19 (2000:14) is devoted to the EKB, but it is still not clear whether EKB is officially part of the LORWUA. In fact, all water use right holders in Ebenhaezer should be members of the LORWUA to enable the WUA to play its role as service provider, but a clear distinction should be made between the domestic users in Ebenhaezer (who have no specific water use rights since they are serviced by the Matsikama Municipality under LORWUA) and the Ebenhaezer small- scale farming community (who have water use rights). LORWUA does not recognize the community as a water user and at this stage, only the farming community is recognized. Conclusion This study analyzed the difficulties and opportunities with regard to the involvement of HDIs in the LORWUA. It focused on the accommodation of HDIs in the process of transformation from an IB to a WUA. Numerous problems and obstacles were identified and described. Problems with regard to HDIs water entitlement, like canal flow (water supply), as well as active participation in the decision-making process in the LORWUA MC were identified as the most important issues. A range of secondary problems could be derived from these two main problem areas. Variation in canal flow is the most important quantity-related problem faced by HDIs (EKB) in the LORWUA. It was shown that the LORWUA EKB meter does receive on average more than enough water during the year, but that water supply in the peak period was inadequate because of canal transportation losses, high demands, insufficient storage facilities, and large losses within the internal distribution system of the EKB. This factor led to a significant water deficit in the peak demand season from November to February. Moreover, the internal canals of EKB are in urgent need of repair. There are also internal problems of water management within the Ebenhaezer community. However, these problems are not easily solved because of the complete lack of control that Ebenhaezer has over the incoming flow. Even though the WDM theoretically uses surplus water, it actually has priority over the Ebenhaezer community in periods of drought so its water entitlement, as a primary user, should be clearly defined and catered for. There should soon be a balance dam upstream of the EKB meter to help smooth the supply for that point. It is, however, not completely certain to what extent the balance dam will solve the problems of water flow entering the Ebenhaezer community. The dam will anyway provide a good opportunity to set up an efficient collective management of water distribution within Ebenhaezer. The current and future position of the Ebenhaezer small-scale farmers vis-à-vis the LORWUA is not clear. The LORWUA is keen to ask them to pay water fees if they are to get the same service as other farmers, but the small-scale farmers may not be able to pay such large fees. A solution may be to define lower fees specifically for these small-scale farmers. 29 The Letaba Water User Association The studied area covers parts of two local municipalities, Greater Tzaneen and Ba- Phaborwa, under the Mopani District Municipality in the Limpopo Province. The area is within the former Republic of South Africa and the former Lebowa and Gazankulu homelands (figure 12). The Great Letaba River is an international river with headwaters in the high rainfall Drakensberg Mountains, and it flows through arid areas and the Kruger National Park into the Olifants River in Mozambique (DEAT 2001). Forestry and irrigation occur in the well-watered western zone. Most of the human settlements are in the central zone, and the eastern zone is characterized by nature conservation and game ranging areas. Irrigated agriculture is the mainstay of the local and regional economy, with citrus, mangoes, bananas, litchis, and selected vegetables as the main crops. In November 2001, the Letaba Water User Association (LWUA) replaced the previous Letaba Irrigation Board, which was founded in 1960. The Letaba IB was established under the previous Water Act (Act 54 of 1956) and its main function was to manage irrigation development only. The main reason for transforming IBs into WUAs is to open the management of their water systems (canal, part of a river) to all the stakeholders, especially the historically disadvantaged individuals (HDIs) who were not associated with management in the past. First, the study documents what has changed for the local HDIs with the transformation from the IB into a WUA, as well as what could be expected. Second, the study investigates what is and could be the role of the new WUA with regard to the integrated water resource management (IWRM) of the catchment. The first section of this case study presents the general methodology, especially the stakeholders interviewed. The following section provides some background information on the waterworks, the water users, the current water management issues in the basin, and the management practices of the LWUA. Then, an assessment of the needs of HDIs is presented to enable an analysis of the current and possible actions of the WUA with regard to the HDIs. The last section describes the current involvement of the LWUA in the IWRM of the basin. Methodology The study was based mainly on semi-directed interviews with the various stakeholders: commercial and emerging farmers, environment representatives, municipalities, nongovernmental organizations, the Department of Agriculture (DoA), the Department of Water Affairs and Forestry (DWAF), etc. A total of thirty-three persons were interviewed (table 6). The reference codes given in this table will hereafter be placed in brackets and used at the end of a relevant sentence to signify that a specific stakeholder is the source of information. 30 Table 6. Stakeholders interviewed in the Great Letaba WUA. Stakeholder Reference Number Letaba Water User Association Emerging farmers Commercial farmers Canal Committee Members DWAF DoA Department of Environmental Affairs and Tourism (DEAT) Department of Land Affairs (DoLA) Lepelle Northern Water Tzaneen Municipality Tribal Authority Kruger National Park Consultant Company Water Bailiffs Farm Worker Farm workers’ Union Murchison Mine WUA1, WUA2 EF1, EF2, EF3, EF4, EF5 CF1, CF2 GV1, N&N1, PU1 DWAF1 DoA1, DoA2 DEAT1 DoLA1, DoLA2 LNW1 TM1 TA1, TA2,TA3,TA4 NRI GM1, CJ2, AVR3, DU R4 WB1 FW1 FWU1, FWU2 MM1 2 5 1 3 1 2 1 2 1 1 4 1 4 1 1 2 1 Total 33 Context Waterworks Storage Units There are two large water storage dams in the Great Letaba catchment, the Ebenezer and Tzaneen Dams, both of which fall under the jurisdiction of the LWUA. The association provides funds for the operation and maintenance of these dams by the DWAF. The Ebenezer Dam lies within the high rainfall region of the Letaba River basin in the upstream part of the Letaba River, downstream of the confluence between the Broederstroom and Helpmekaar Rivers. It was completed in 1959 and has a capacity of 70 million cubic meters. The Ebenezer Dam supplies water to Polokwane, the Tzaneen Municipality, and farmers. There is no industry between the Ebenezer and Tzaneen Dams. The Tzaneen Dam, completed in 1977, is situated on the Great Letaba River immediately upstream of the town of Tzaneen. It was constructed mainly to meet the irrigation water demand along the Great Letaba River valley. Water is also supplied to a mine and several urban and rural villages. The Tzaneen Dam’s storage capacity is 157 million cubic meters and allowance has been made to increase this to approximately 250 million cubic meters. Storage Weirs Several weirs are built along the Great Letaba River. In accordance with an agreement with the DWAF, these weirs are operated and maintained by the LWUA, though they are owned by the DWAF. They are located downstream of the Tzaneen Dam in the following sequence: Yamorna, Junction, Jasi, Prieska and Nondweni (the Nondweni Weir is situated close to the Mabunda Scheme in figure 12). The Nondweni Weir is of importance because, on hot days, the upstream commercial farmers pump large amounts of water and there is a risk of not getting the scheduled minimal flow for the Kruger Park downstream. 31 The Canals Irrigation farmers can be grouped into pump and canal irrigators. Pump irrigators abstract water directly from the river whereas canal irrigators obtain water from the canals. The canals are privately owned and are under the jurisdiction of the LWUA. There are five canals in the catchment, namely George’s Valley, Pusela, Letaba North, the N and N, and the Masalal Canals. Two of the canals are between the Ebenezer Dam and Tzaneen Dam (George’s Valley Canal and Pusela Canal) and the other three canals are between the Tzaneen Dam and Nondweni Weir (Letaba North, N and N, and Masalal Canals— cf. figure 12). Figure 12. The Great Letaba River Basin. George’s Valley Canal is 11 kilometers long and serves 17 farmers, none of whom are emerging farmers. The canal is located on the right bank of the Great Letaba River. It is lined with concrete and has a maximum discharge capacity of 0.196 m3/s. Water is supplied by gravity from the canal to the farmers. In normal conditions, the canal is operated 12 hours per day for 5 days a week, i.e., 250 days a year. The volume of water diverted into the canal is metered at the head of the canal. The total scheduled area supplied from this canal is 376 hectares. The annual irrigation quota for the whole area is 2.5 million cubic meters per year (DWAF 1990). The Pusela Canal was built in 1965 and now serves 130 farmers. Irrigation water is diverted into a concrete-lined canal by a weir in the river, located 7 kilometers upstream of Tzaneen. The water is conveyed in the main canal 29 kilometers long, and distributed via several secondary canals. The maximum discharge capacity of the main canal is 1.06m3/s. The gates are open 24 hours a day, and as such, some farmers have built balancing dams to store the water that flows during the night. The total scheduled area supplied from this canal N 32 is 997 hectares, with an annual irrigation allocation of 7 million cubic meters. There are no emerging farmers on this stretch of the river. The Letaba North Canal is on the left bank of the Great Letaba River, just downstream of Tzaneen. Water is diverted from the Great Letaba River into the canal by means of the Letaba North Canal Weir (also called Yamorna), approximately 5 kilometers downstream of Tzaneen Dam on the Broederstroomdrift farm. The canal is 43.2 kilometers long and is lined with concrete. The maximum discharge capacity is 2.60m3/s. The total scheduled area is 2, 951 hectares, and the total irrigation quota is 27.8 million m3/yr (DWAF 1990). The N&N Canal system is on the right bank of the Great Letaba, downstream of the town of Tzaneen. Water is diverted from the Great Letaba River into the canal from the N&N Weir (also called Junction), approximately 15 kilometers downstream of the Tzaneen Dam. The N & N Canal consists a main canal, 35.4 kilometers in length, and several secondary canals. These canals are lined with concrete and the maximum discharge capacity of the main canal is