h@li# Consultative Group on International Agricultural Research - CGIAR Mid-Term Meeting 1995 Nairobi, Kenya May 22-26,1995 1 Renewal of the CGIAR: From Decisions to Actions 1 Report of the 5th Meeting of the Finance Committee (October 21 and 27,1994) At ICW94, the Chair of the Finance Committee, Mr. Michel Petit, reported the outcome of the 5th Meeting of the Finance Committee, which covered 1994 funding, 1995 funding and financing plan, and 1996 planning as well as the continued review of the new financing arrangements. A written report of the Meeting, supplemented by the detailed circulars sent to the Centers on the decisions taken by the Finance Committee, is attached for information. CGIAR Secretariat l Mailing Address: 1818 H Street, N.W., Washington, D.C. 20433, U.S.A. l Dffice Location: 701 18th Street, N.W. Tel: (l-202) 473-8951 l Cable Address: INTBAFRAD . Fax: (l-202) 4738110 l E-mail: CGIAR@cgnet.com or CGIAR@wcddbank.cxg Fifth Meeting of the CGIAR Finance Committee The CGIAR Finance Committee held its fifth meeting in Washington, DC. at the CGIAR Secretariat on October 21 and 27, 1994. Michel Petit of the World Bank chaired the meeting with the participation of Australia (Eric Craswelll, Canada (lain MacGillivra y), Denmark (Ebbe Schioler), Germany (Jiirgen Friedrichsenl, Japan (Kunio Alakamura), Philippines (Manuel Lantinl and the United Kingdom (Andrew Bennett). Regrets were received from Brazil (Mario Alves Seixas). Key Points 1. NEW FINANCING ARRANGEMENTS from Discussion across all programs, incentives for reducing l thereby overhead providing costs. The Finance Committee continued the review of the new financing arrangements proposed for the CGIAR (“New Financing Arrangements: Re-engineering the CGIAR Planning, Budgeting and Funding System”, ICW/94/09 dated October 6, 1994). In this context it also reviewed a preliminary analysis prepared by the Secretariat on the overhead costs of Center operations. Points raised in the discussion in addition to those raised in the fourth meeting of September 1994, are outlined below. The costs and efficiencies of restructuring the livestock and banana/plantain efforts should be considered as case studies, from which the CGIAR may learn valuable lessons. These two instances should be monitored by the CGIAR to learn from this experience in restructuring and changing program directions. Multi- Year Financial l Commitments Structure l and Operation of the Matrix matrix should not cage, it should be broad program micro-management Center and system The cells of the new become an inflexible defined in sufficiently terms so as to avoid and restriction of the programs. l The analysis presented by the Secretariat indicates that the average cost of “fixed overhead” is USSI .6m year. per However, this should not be considered the minimum cost of CGIAR participation, and opportunities to increase efficiency need to be found to reduce governance costs for smaller Centers. Therefore, rather than a separate column (the ‘F’ column in the present draft matrix), fixed overheads should be incorporated into the and should be programs Centers encouraged to move to full cost recovery A replenishment option may evolve in the future, if strong political commitment to the CGIAR emerges from the high-level For this meeting in February 1995. the reason, together with possible improvement of funding stability, the option of the CGIAR evolving ‘towards a legal entity in the long term, should be kept on the table for the present. A legal personality for the CGIAR does not necessarily mean CGIAR’s transformation into an international organization, and some imaginative ideas could be explored if there is demonstrable high level political support for the CGIAR at the Lucerne meeting. 2. 1994 FUNDING The Finance Committee reviewed the status of 1994 funding in context of allocating the 1994 Bank funds remaining after allocations made at the September meeting. The amount of: - available for allocations consisted equally between the Centers and the system. This principal would be applied also in other similar cases in the future. . In 1994 funding terms, this implies that both ICRISAT and WARDA should receive about $0.75 million less than their allocated shares of Bank funds in 1994. - $0.5 million not allocated at the September meeting, an additional $0.5 million available as a matching contribution due to the $1 million additional IDB contribution in response to the Chairman’s appeal. $0.9 million due to the reduced cost of operations for WARDA and ICRISAT resulting from a devaluation of their host countries in West Africa (discussed below). (decisions reflected in memo to Center Directors with subject Re: Allocation of the Find Tranche of the 1994 Worki Bank Contdwtion, dated November 16,1994) Allocation l of Remaining Bank Funds 3. 19% FUNDING AND FINANCING PLAN The Committee decided that this total of $1.9 million should be distributed to those Centers whose funding was below their allocation in the $270 million vector after the September allocation. The allocation would be in proportion to their funding gap. The Finance Committee reviewed the limited amount of funding indications provided by the donors to the Secretariat and examined several options for developing firm financing figures for each Center. The goal was to have a 1995 financing plan by the end of ICW94, that could guide the however tentative, Centers for planning their 1995 operations. l Devaluation . Adjustment the Finance At its April meeting, Committee held back the disbursement of the second tranche to WARDA and ICRISAT pending full cost analysis of the impact of CFA devaluation on their 1994 operations. The Centers were requested to compute the full cost impact on their operations of the devaluation of the CFA (African French Franc) that took place in January 1994 and provide such analyses to the Finance Committee by endSeptember. The analysis provided by the two Centers indicated that the net 1994 cost reduction in dollar terms (the combined impact of devaluation and resulting inflation) was roughly equal at about $1.5 million. The issue debated by the Finance Committee was the criteria and method for cost adjustment sharing such “windfall” between the Centers and the system. The Finance Committee concluded that the most equitable and reasonable method would be for the windfall to be shared l The Committee accepted the projected allocation to Centers of 1995 contributions prepared by the Secretariat as an initial starting point. One key issue debated by the Committee was the allocation of Bank funds to complete the financing picture for each Center. The discussion included the need for a substantial disbursement as early as possible as well as the need to ensure a balanced funding of the overall The latter point would research agenda. require that the CGIAR retain some flexibility in the Bank funds to take into account allocations by donors to various Centers. Another issue was also to in and stability maintain continuity allocations between 1994 and 1995 due to the transitional nature of the period. l l The Committee recommends to the CGIAR that the Bank funds be allocated in at least tranche The first tranches. two representing 50%, or $25 million, of the total Bank funds expected to be available of $50 million. The subsequent tranches will take into account the balancing needs as well as additional donor information. 2 . The implementation of this plan is dependent on receiving the remaining 1995 funding information from donors as early as possible and the Committee encourages all donors to be as prompt as possible in providing the information to the Secretariat and disbursing the 1995 funds. respond to the needs of the matrix. The TF will aim to complete its work by midNovember. 1996 gm -- Guidelines for Center 1996-98 proposals (a short update in context of the parameters used by TAC) will be sent out by end November. 1996 recommendations -- TAC will interact in March and come forward at MTM94 with its recommendations for 1996 in context of 1996-98 as proposed in the new scheme of things. (decisions reflected in memo to Center Directors with subject Planningfor 1995 Strpport to Agreed Research Agenda, dated November 19,1994) 4. PLANNING FOR 1996 1996 Financial Assumptions be based on 1996 plans would financial expectations for 1995. They could include a modest amount of increases over The Finance the 1995 levels. Committee also briefly discussed its own 1995 work program related to the 1996 program plans. Based on procedures agreed before, the Finance Committee will examine the financial implications of the 1996 TAC recommendations at its meeting during and prior to the Mid-Term Meeting. Drs. McCalla and Winkelmann, the incoming present and TAC Chairs respectively, presented to the Committee the process for preparing the 1996 program and funding proposals to the CGIAR. The interaction with the Finance Committee was part of the consultative process with Centers and the CGIAR Committees leading to a discussion in the Group during ICW under agenda item ICW/94/08. Planning l Frame will the can (i.e. the l The present five year plans 1994-98 serve as a planning framework for remaining period i.e. 1996-98. The reexamination of CGIAR priorities proceed on a track currently planned, aiming at completion in time to launch 1999-2004 medium term plans. (decisions reflected in memo to Center Directors with subject Planningfor 2996, dated November 18,1994) (decisions reflected in memo to Center Directors with subject Re: Centers’ 1996Program Plans and Funding Requirements, dated December 15,1994) Con tent of 1996 Process l 5. The 1996 review will reexamine whether changes in circumstances (new scientific breakthroughs, shift in aid priorities, etc.) in the 1996-98 require changes allocations. Program structure -- A task force will be together by the TAC Chair with participation by primary stakeholders (Centers, donors, TAC and Secretariat, CG Secretariat) to examine the activity structure and propose refinements to FINANCIAL IMPLICATIONS OF SYSTEMWIDE INITIATIVES PROPOSED IN 1995 One of the rationalizations for program funding is the need to develop new partnerships, involving IARCs, NARS, laboratories and advanced NGOs, specialized institutions, and move the CGIAR Centers from being CG-centric. New financial mechanisms should provide incentives for partnerships within and These beyond the CGIAR system. partnerships will be critical for leverage . . 3 influence of the CGlAR funds in the broader matrix of activities beyond the The management of this CGIAR. interface is very important. . Partnerships have high transaction costs and these need to be recognized. As various financial modalities evolve for the Finance partnerships, building Committee could usefully examine the of various cost-effectiveness success in and their arrangements, leveraging funding from other sources. 6. l DONOR PERFORMANCE The Committee considered it valuable to monitor trends in donor contributions to the CGIAR, relative to their overall development assistance contributions. The Secretariat will prepare a detailed report for outline of a monitoring discussion by the Finance Committee. 7. NEXT MEETING The Finance Committee will meet in on February 11, 1994 immediately the Ministerial Meeting. Lucerne following 4 I A ttachments 1. Memo to Center Directors with subject Re: Allocation of the Final Tranche of the dated November 16,1994 1994 World Bank Contribution, 2. Memo to Center Directors with subject Planning for 1995 Support to Agreed Research Agenda, dated November 19, 1994 3. Memo to Center Directors with subject Planning for 1996, dated November 18, 1994 4. Memo to Center Directors with subject Re: Centers’ 1996 Program Plans and Funding Requirements, dated December 15, 1994 Consultative Group on International Mailing Address: Agricultural Research 1818 H Street. N.W.. Washington, D.C. 10433. U.S.A. Office Location: 701 18th Strerr. N.W. Telephone (Area Code 202) 473-895 I Cable Address-INTBAFRAD Fax (Area Code 202) 473-8110 November To: From: Center CGIAR Directors Secretariat 16, 1994 Re: Allocation of the Final Tranche of the 1994 World Bank Contribution At its meeting of October 27, 1994, the 1. World Bank (WB) allocation for 1994, to partially remained after the third tranche allocation. The in the attached annexes as the fourth tranche, table below. It is the sum of: Finance Committee (FC) approved the final fill the gaps in the $270 million vector which additional World Bank resources are shown which is over $2 million as described in the (9 adjustments in the allocation of the WB’s earlier tranches to ICRISAT WARDA, prompted by the devaluation of the CFA earlier this year; additional research matching funds agenda; and, triggered by an increase in new funds for the and (ii) 1994 (iii) the reserve set aside in September WB tranche. by the FC during the allocation of the third RESOURCES FOR .THE UORLD BANK’S 4th TRANCHE (B million) Devaluation Adjustments: ICRISAT UARDA 0.65 0.72 Additional September Matching Reserve: Funds: l-l 5n o.L6 Total 2.33 cc: CGIAR Finance TAC Chair TAC Secretariat Committee 2. In the September 30, 1994 letter from the Secretariat, Center Directors were informed of the allocation by the FC of World Bank matching funds ($9.6 million) and the safety net ($2.1 million) which had been set aside from the WB grant earlier in 1994. In addition to informing Centers of the allocation of these WB funds (tne third tranche), the letter also provided details of additional funding forthe $270 million Research Agenda, ie. from relabe!led and redirected complementary funding, and additional contributions from donors other tkzn the WB. 3. The principles guiding the September allocations of the FC were that first, Centers should be funded to their approved level at the $229 million vector and, second, approved to ;ha degree possible. Center funding a; the $270 million vector would 5~ sa:isf;t; This principle is maintained for the allocation of the fourth tranche: systemwide initiatives and the fisheries reserve remain at the same level as previously, as not all the activities are ready for implementation in 1994. The FC allocations were based on gaps remaining in Centers’ funding at the $270 million vector, on an estimate of 1994 income from donors excluding the World Bank, as well as on the allocation of the first and second tranche of WB support for 1994. This estimate derived from information provided by Centers, and from donors. Some funding gaps persist partly because additional funding which became available for the agreed agenda at Centers, from activities which were previously classified as complementary, varied in volume from Center to Center. 4. The following summarizes the FC’s allocation decision on the describes the disbursement plan for the third and fourth tranches. Funding 5. The gross funding gap remaining at the Center level after the third tranche allocation is now $10.4 million (ie. this is the total gap for Centers whose funding is still below the The fourth tranche represents about 22% of approved amount in the $270 million vector). Thus, 22% of each center’s funding gap will be funded the remaining Center requirements. by the fourth tranche. The result is shown in annexes 1 and 2. Estimates of other donors’ funding remain at the level assumed in September, except for the recently-announced increase in unrestricted funding from the IDB, which also results in the additional matching funds referred to earlier. Disbursement 6. Column 5 in annex 2 shows the disbursements to Centers that will result from the FC decisions, taking into account various outstanding amounts, as explained in the footnotes to Disbursement of the third and fourth tranches will be effected after all new the table. contributions pledged as a result of the Stabilization Program have been disbursed or are underway, which is estimated by the Secretariat to be by the end of November. fourth tranche, and Annex 1: Financial Support to the Agreed (in Smillion) Rcscarch Agenda I Sept. 30 Funding ~_____ Status October Adjustment I Approved Funding in I $270 m Vector 27.5 i 7.6 26.5 14.3 17.6 i Center / CIAT CIFOR CIMMYT 1CIP IICARDA /ICLARM ICRAF Estimated Contributions Other ! World than WB’ Bank : Total i 1 21.9 i 4.8 i 6.0! 0.6 I /I I j j/ World ’ ’ Rcviscd -. .jBank 4th / 1 Total / li 5.4 I, I ‘! Trzzchc : I 1 I I ’ Funding __ - I 27.9 25.6 17.6’ 16.0 4.8 j 15.2 : 26.9 9.2 7.6 i 23.3 / 13.1 I 11 jj I/ ” 11 jl I! :, // i’ I 27.9 I 1 i 0.51 1 0.2 / I 1 ; 0.41 j I ! I -0.5 ! 3/i 0.1: ! i j ’ I 0.2 / i 5.9 i 25.8 I 17.6 16.3 4.8 / 15.2 j 26.4 ; 9.3 7.6 : 23.3, 19.6 / ’ 15.8 1 11.2 j 4.4 1 14.1 / 20.7 / 8.2 / 6.0 17.5 9.7 6.8 1.8 / / t I 4.8 14.0 1 ICRISAT IFPRI i IIMI 1IITA ’ ILCA ILRAD INIBAP IPGRI i IRRI ISNAR WARDA I Ccntcr total CIP Provision / 26.9 9.5 7.6 23.3 14.0 11.1 1.8 1 / j 6.0! 1.8 4.7 0.4 1.0: 6.2 I 1.0: 1.71 5.8 / 3.4; 3.lj i 0.2 3.1: 1.91 0.7; ! 48.2 : : ’ ! , : I I ! I i I 13.3 I i/A i il---fy-g 27.3 : ‘I 6.5 i I/ 7.6 j 1’ : i’ ,I 254.7 !’ Ok! ! 27.7 / 6.6 j 6.9 1 I 255.7 9.2 29.3 1 / 1 I 6.8 1 5.8 I 257.6 / / 8.2 1 24.2 j 4.7 j 6.9 j 206.5 ; 0.81 1 O.l! -0.7 / I 2.3 I 1 i I 0.8’ 10.0 1.0 I l/l 268.6 1 1 8.7 1 I i 0.8 21 I/ 9.2 I i II ‘! I I / I /i ! I ! ’ I 0.8 ; 8.7 Initiatives / j Systemwide Fishcries Res. j System total / 0.5, I 1 ~ / 215.2 j I i I , 49.5 I 4/ 264.7 ; ji 2.3 ! 5/j 265.2 I/ The fisheries reserve is unfunded hccnusc the cnvisagcd activity is not ready for implcmcntation in 1994. 21 ‘l’hc CII’cost rccovcry grant was not inciudcd In the $270 m vector. and its I’und~ng was trcatcd ;L.S ;~n exceptional allocation based on a decision taken in 1993 by the Group. 3/ Amount is sho\xn net of devaluation adjustment of -S.65 m and ICRISA’I-s 1111tranchc allocation oiS.1.i m. 41 In Scptembcr a rcservc ofS.46 million from the World Bank had been set aside for future allocation. 51 Amount sho\\n is the gross fourth tranchc (ix.. the devaluation adjustments xc not ncttcd out). 16-Nov-94 Annex 2: Allocation and Disbursement of 1994 World (in S million) Bank Third and Fourth Tranchcs 1 Center $0 I Tranchel ! Tranchei Gap I CIAT 0.98 I CIFOR 0.12 2.24 0.50 I LllvllvI r-7. I. IlIT 1 ?I n 0-l !/ n ?ll L..TcJ I “.L” U.OI I I / I I !CIP / ) ICARDA 1.981 1.63 i 0.37 1ICLARM j ICRAF TCRISAT _-__--__1IFPRI 1IIMI j IITA .WA ...-!.--/ ILRAD 1 ! INIBAP 1 IPGRI I ; IRRI / ISNAR i WARDA Total I 1.53 I 0.34 j 1.62 / 1.m ---1.211 1.1Oi 0.48 0.63 0.65 / 0.30 Adjustment / I I j 1 0.15 1 0.07 j 0.91! 0.20 0.27 ( 0.05 j 0.46 j 0.07: 0.24 / 2.06 0.30 11.14, 10.411 2.33 I Vovcmbcr 3rd & 4tQ 1 I 0.98 1 0.98 1 I 0.62 ( 0.62’ I 1 CL! n I-MI ~l/ “.\I” I..)“, I I I ) 3 15 I 2.Zi -._._. -... I , I I \ 1 1 I -0.65 ; 21 I 1.03 I, 1.03 ) 0.07 I I 0.07 ( I 0.34 1 I 0.34 j I 1 1.62 I 1.62 j 1.20 1.20; 1.37 / 1.37 I I I I 0.05 j i I 0.05 : 1 I 0.94 I 0.94 ) I / 0.70 I 0.70 / -0.7212/ ) -0.72 / I I -1.37; I 12.10 1 11.32; Memo Items: 1994 WB;lOutstanding Amounls /I 1st & 2nd ! Total II 5.00 I jl 0.47 I 1.1 :I 4.61 6.2:! : II I’ 1’ 2.61 2.6 I 0.5!3/ 5.1 '! /i 2.76; ! 0.35 : 0.5 31 ;i 0.4 il , I 1.0/j 1.04 i )( 4.70 / 5.7 I ! 1.00 j 1.1;1 I /j 1.32 I 1.7,) I/ 4.16 ! 5.8 ,. ;/ 2.42 : 3.61; I 3.4 !/ ! (i 1.981 I 1, I I: 0.15 ; 0.2 ,, 0.75 0.8 I: I ,! j! 2.58 / 3.5 Ii 1.22 j 1.9,; I iI 0.72 / 0.0) 1.2!3/ ]I I II , I/ 37.87 / 50.0 :i 3.1: : i I ; I ! j 1 I I I RECONCILIATION ! Sourccc: --_‘-. Original WU Matching funds total Applications: Tranches I & II Safety net Matching funds total / 2.1 100 i 50.0 1,’ Net of outstanding loan of $1.5 m. U Devaluation adjustment approved by Finance Committcc 3/ Advance/short-term loan. in October, 1994. 15-Nov-94 . Consultative . Mailing Address: Group on International Agricultural N.W., Research Washington, D.C. The World Sank, 1818 Office H Street, Locatron: 701 18th Street, N.W. Teleph~~4~l32~~.?73-895 1 Cable Address: INTBAFRAD Fax: (l-202) 473-8 1 10 November 19, 1994 To: From: Subject: Center Directors The Secretariat Planning for 7995 Support to Agreed Research Agenda The purpose of this memorandum is to bring you up-to-date on the 1. allocation of resources expected to be available for the Agreed Research Agenda in 1995. 7995 Requiremen is 2. At ICW94 the CGIAR endorsed a 1995 research agenda with financing requirements of $271.2 million, consisting of $262.8 million for Center reviews) and $8.4 million f?budgets (including provisions for external systemwide initiatives. 7995 Funding Projection 3. At ICW, the Secretariat projected that about $265 million would be available to finance the agreed agenda in 1995. Since then we have reviewed the estimate, and confirm that it remains broadly in line with the earlier one. The projection presently stands at approximately $268 million (Annex 1 I. 4. The following assumptions underpin the 1995 projections: contribution Donors who have yet to confirm and allocate their (9 to centers will retain the 1994 level and allocation; and cc: CGIAR Finance TAC Chair TAC Secretariat Committee (ii) Exchange rates not deviate significantly Ma tcbing Funding with at disbursement of non-dollar from those used at ICW. contributions will Requirements 5. At the system level, the present projection indicates that the Agreed Research Agenda is likely to be clo-.. =o to fu’!y funded in 1995. At the center level, however, full funding is projected ior fewer tnan haIT oi tne sixteen centers (column 7 in Annex 2). World Bank s Contribution 6. At its October meeting the Finance Committee approved, for use in 1995, the same formula used in distributing the World Bank’s contribution in 1994. Thus half of the Bank’s $50 million (including about $10 million in matching funds) has been allocated in proportion (of 9.5%) to each center’s The other half will be used to co-finance with other approved requirements. The Finance Committee will review the funding donors the remaining gaps. situation in February/March, and allocation of the second tranche may be subject then to adjustments. 7. The Finance Committee also approved the tranche of the World Bank’s 1995 contribution. disbursed on or about January 1, 1995, and the February/March review of funding. Implications of the Present Estimate for Centers disbursement of the first The first tranche will be second tranche after the Annex 2 shows the tentative allocation of the overall funding projection 8. However, the projection remains tentative as precise among the centers. information from a number of donors regarding their 1995 conrrioutions as well Refinements will continue as more as their .allocation is still being awaited. information becomes available, and the Secretariat plans to inform each center in January of details of its 1995 funding prospects by donor. 9. Due to the tentative nature of the projections with few exceptions, should plan their operations approved requirements. at this juncture, centers, at 1 - 2% below their Current I _pporting Su 0.4; LGIUM ICANADA I l CoreBedirected O? 0.0 / 0.3 I tc [ 2.1 ( 11.71 0.6 ( 2.61 0.0: 0.8, IFAD OPEC FUND ’ UNOP UNEP ’ Sub-total l I 3.2 / 0.0 0.0) 0.5 0.51 0.5) 0.2, 0.0 j I ! 0.0 0.0 0.0 3.2 155.9 40.0 1 I 195.9 0.2 5.3 0.0 7.2 28.6 0.0 I 28.6 1 I 0.0’ 0.9 0.1 2.9 13.4 0.0 1 13.41 I 0.0 1.7 0.0 3.6 10.6 5.3 j I 15.9i I I 1.7 9.4 4.7 14.1 j I I 5.21 1.01 0.2 I 7.81 0.1 j 18X/ 217.8 50.0 ] TOTAL WORLD I I BANK TOTAL GRAND I I I 267.8 i I I I l I Non-CGIAR donors Unconfirmed donors 1 I Annex 2. 1995 TENTATIVE FINANCING (in $million) 1995 Requirements --i Center CIAT CIFOR CIMMYT CIP ICARDA ICLARM ICRAF ICRISAT IFPRI I&II IITA ILRI IPGRI IRRI ISNAR WARDA .erve Fisherid PLAN I I I I i , I- Funding in First 1 Second Relation to Support 2/ Project 3/ Tranche 4/l Tranche 5/ Funding 1Requirements I I 27.8 18.4 3.61 2.6 ( 2.9 j 27.5 99% 7.6 4.9 0.1 0.7 1 1.8 1 7.5 98% 26.5 17.2 3.1 2.5 / 3.41 26.2 1 99% 16.5 12.1 3.2 1.6 1 0.0 / 16.9 1 102% 17.6 7.3 I 6.0 1 17.4 I 1.7 I 2.4 i 99% 4.9 2.5 2.2 0.5 0.0 -5.1 105% 14.0 5.1 9.7 1.3 0.0 16.1 115% 16.3 26.9 4.9 1 2.6 2.9 26.6 99% L