Etude preparatoire de l'evaluation a Mi-Parcours du Projet IIMI-PMI-Niger: Rapport final - Etude realisee a la demande du Projet IIMI-PMI-Niger sous contrat en date du 18-10-1994. In FrenchPreparatory study of the Mid-Term Project IIMI-PMI-Niger: final report - study conducted at the request of the Project IIMI-PMI-Niger contract dated 18-10-1994. In French

Loading...
Thumbnail Image

Date Issued

Date Online

Language

fr
Type

Review Status

Access Rights

Open Access Open Access

Share

Citation

Abdourahmane, A. T. 1995. Etude preparatoire de l'evaluation a Mi-Parcours du Projet IIMI-PMI-Niger: Rapport final - Etude realisee a la demande du Projet IIMI-PMI-Niger sous contrat en date du 18-10-1994. In French. [Preparatory study of the Mid-Term Project IIMI-PMI-Niger: final report - study conducted at the request of the Project IIMI-PMI-Niger contract dated 18-10-1994. In French] Niamey, Niger: International Irrigation Management Institute (IIMI). 75p.

Permanent link to cite or share this item

External link to download this item

DOI

Abstract/Description

Countries

Collections